Am Dienstag, 12. Februar 2019 15:01:43 UTC+1 schrieb [email protected]:
> Zitat von Claas Goltz <[email protected]>:
> 
> > Hi,
> > is it technically possible to spool and despool at the same time?
> >
> > For example (fictitious values)
> > given: 100GB Volume
> > 50GB Spoolsize
> >
> > - Tape job starts spooling 50 GB: 10 min
> > - writing (despooling) to tape: 10 min
> > - after despooling, spool the next 50gb: 10 min
> > - despooling 50gb: 10min
> > = total 40 minutes
> >
> > if we despool and spool at the same time, we gain much time!
> >
> > - spooling first part 50GB 10min
> > - despooling frist 50GB to tape, while spooling the next 50GB 10min
> > - despooling the next 50GB 10min
> > = total 30miutes
> >
> > so that would be 1/3 faster. If you have large/much jobs that would  
> > gain enormous time.
> > Thanks
> > Claas
> 
> You should try to split the jobs. Different jobs can spool while  
> another one is despooling. But be aware that you need a really fast  
> spool area to feed a recent LTO and spool at the same time.
> 
> Regards
> 
> Andi

I have multiple Jobs. But I can only write 1 job simultaneously to the tape 
drive.

-- 
You received this message because you are subscribed to the Google Groups 
"bareos-users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to