We have included both paved shoulders and sidepath in the Plan as options. We heard 
from many Town and Village residents that they would like to see a sidepath along 
Woodland, in order to accommodate more casual bikers, joggers and walkers, and 
children. Traffic volumes on Woodland are quite high, particularly at rush hours, and 
will continue to grow with new development on Waunakee's south and east sides. The 
existing paved shoulder on the roadway will eventually not provide a good biking route 
(and a very poor pedestrian route) due to the increase in traffic. Woodland is an 
obvious main north-south link. Many children from Waunakee use Westport's recreational 
fields, and it would be great to provide them with a safe means to access them. 
Perhaps ideally, the side path and the on-street facility would both exist and 
compliment each other. The ultimate decision on what facility is constructed and when 
will be decided by the Town and Village, as well as by the availability of funding 
resources. I've included the language of the draft Plan below.

"In speaking with Village and Town residents, the Woodland Drive corridor was most 
often mentioned for bike and pedestrian improvements. An improved north-south link 
should be made, especially for bicycles, to facilitate movement between the Village 
and the Town, and to other regional destinations. Two options were considered for 
bicycle and pedestrian accommodations.
Option One improvements would include widening Woodland Drive to accommodate a new 
4-foot wide bike lane on each side of the road, 3-foot gravel shoulders on each side, 
re-grading to establish ditches, and restoration of disturbed areas. Slopes from 
shoulder to ditch bottom and from ditch bottom to right-of-way line may be steep if no 
land or grading easements are obtained. This work would more easily be accommodated as 
part of the rehabilitation of the entire roadway. This option will likely require 
acquisition of a 5-foot wide permanent easement along each side of the road. If 
drainage permits, grading easements (15 feet or so) may be sufficient.

Option Two would include construction of an off-street multi-use path along the west 
side of Woodland Drive. The south portion of the project includes required clearing 
along DNR lands, and construction of path in lowlands, which have questionable soil 
stability. The path route will require avoidance or mitigation of disturbances to 
trees, fences, and the driveways of several existing residences. Power poles and 
buried telephone cable exist along the entire west side, which may require additional 
funds to move. This option will require acquisition of a minimum 15-foot permanent 
easement along the west side of Woodland Drive, and likely another 15 feet for 
construction easement adjacent to the permanent easement.

To facilitate bicycle and pedestrian access to a wide range of people, the Village and 
Town may ultimately wish to consider constructing both facilities as a third option 
over time. A logical sequence may be to construct the path first, then wait to 
construct the bike lanes until the complete reconstruction of Woodland is warranted."

Again, the entire draft Plan will be available for review soon. We will let everyone 
know when and where they may take a look at it.

---Original Message-----
From: Michael Rewey [mailto:[EMAIL PROTECTED]
Sent: Thursday, August 26, 2004 6:16 PM
To: [EMAIL PROTECTED]; Cathi Wielgus
Subject: Re: [Bikies] Re: Waunakee-Westport Bike Plan


Can we assume both the paved shoulders and sidepath will be
built.  I am not a sidepath fan, but if you must, it should never be at
expense of on-road bike accommodations.

Mike Rewey
[EMAIL PROTECTED]
"so many roads.. so little time..."

*********************************************

Date sent:              Thu, 26 Aug 2004 12:02:59 -0500
From:                   "Cathi Wielgus" <[EMAIL PROTECTED]>
To:                     <[EMAIL PROTECTED]>
Subject:                [Bikies] Re: Waunakee-Westport Bike Plan

>
> The Plan presents two options for Woodland Road: a sidepath similar to
> what the Village has been constructing, and an improved shoulder for
> on-street riding, when the road is reconstructed.
>
> The Plan recommended a number of routes on existing roads and
> potential facility improvements for on-street riding, in addition to
> off-road accommodations.
>
> The draft Plan is being reviewed by Town and Village staff, and will
> be available for public perusal within the next couple of weeks.
>
>
> Cathi Wielgus, AICP
> Assistant Planner
> Vandewalle & Associates
> 120 E. Lakeside Street
> Madison, WI  53715
> 608.255.3988
> www.vandewalle.com
>
>
>
>
> The information contained in this communication may be confidential,
> is intended only for the use of the recipient(s) named above, and may
> be legally privileged. If the reader of this message is not the
> intended recipient, you are hereby notified that any dissemination,
> distribution, or copying of the communication, or any of its contents,
> is strictly prohibited. If you have received this communication in
> error, please return it to the sender immediately and delete the
> original message and any copy of it from your computer system. Please
> not that any views or opinions presented in this e-mail are solely
> those of the author and do not necessarily represent those of the
> company. Finally, the recipient should check this e-mail and any
> attachments for the presence of viruses. The company accepts no
> liability for any damage caused by any virus transmitted by this
> e-mail. If you have any questions concerning this message, please
> contact the sender.




The information contained in this communication may be confidential, is intended only
for the use of the recipient(s) named above, and may be legally privileged. If the 
reader
of this message is not the intended recipient, you are hereby notified that any 
dissemination,
distribution, or copying of the communication, or any of its contents, is strictly 
prohibited.
If you have received this communication in error, please return it to the sender 
immediately
and delete the original message and any copy of it from your computer system. Please 
not that
any views or opinions presented in this e-mail are solely those of the author and do 
not necessarily
represent those of the company. Finally, the recipient should check this e-mail and 
any attachments
for the presence of viruses. The company accepts no liability for any damage caused by 
any virus
transmitted by this e-mail. If you have any questions concerning this message,
please contact the sender.
_______________________________________________
Bikies mailing list
[EMAIL PROTECTED]
http://www.danenet.org/mailman/listinfo/bikies

Reply via email to