A map of campus area detours can be found here: http://www2.fpm.wisc.edu/trans/maintenance_closures_detours.asp
There is a link from the UW Transportation Services main page (under the heading "Major Construction on Campus") here: http://www2.fpm.wisc.edu/trans/ The map is updated on regular basis as conditions on the street change. Chuck Charles Strawser University of Wisconsin Transportation Services-Commuter Solutions Pedestrian/Bicycle Coordinator 610 Walnut Street, Room 124 WARF Madison WI 53726 PH: 608-263-2969 FAX: 608-265-3424 ________________________________ From: [email protected] [mailto:[email protected]] On Behalf Of Mitch Sent: Sunday, July 12, 2009 9:38 AM To: Bikies e-mail list ([email protected]) Subject: Re: [Bikies] Univ Ave Bike Detour Interesting, indeed. An alternative detour would be to get on the SW path at Mills St. If you need to get back to the University Ave. corridor, you can take Breese Terrace, or cut through the paths in Camp Randall. Not exactly a direct route, but not too bad, under the circumstances. On Mar 16, 2009, at 7:50 PM, Michael Rewey wrote: The Stage 3 Detour should be interesting. Randall Ave from Dayton to Campus Drive is slated for reconstruction this summer and the first block of West Dayton east of Randall is already restricted down to one-lane in each direction with no bike lanes because of the Union South construction. Mike Rewey ***************************** On 16 Mar 2009 at 17:16, Ross, Arthur wrote: As some may have noticed, the University Ave reconstruction projected started today. A link to the plans and the bicycle detour is posted on Traffic Engineering's website in two places. Since the detour will change as the phases change, here is how to navigate to the page. 1) on Traffic Engineering's Home Page http://www.cityofmadison.com/trafficengineering/ click on University Ave Pavement Rehab info http://www.cityofmadison.com/trafficengineering/documents/Announcements/Unive rsityAv2009/UniversityAvePavementRehabInfo.cfm 2) Under Bicycling & Walking / Bicycle & Walking Maps click on University Ave Construction Detours http://www.cityofmadison.com/trafficEngineering/documents/Announcements/Unive rsityAv2009/UniversityAvePavementRehabInfo.cfm The pdf for the current detour route is http://www.cityofmadison.com/trafficengineering/documents/Announcements/Unive rsityAv2009/BikeRouteDetourMaP_Stage1_200dpi.pdf Arthur Ross, Pedestrian-Bicycle Coordinator City of Madison Traffic Engineering Division 215 Martin Luther King, Jr. Blvd., Suite 100 PO Box 2986 Madison, WI 53701-2986 608/266-6225 _______________________________________________ Bikies mailing list [email protected] http://lists.danenet.org/listinfo.cgi/bikies-danenet.org _______________________________________________ Bikies mailing list [email protected] http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
_______________________________________________ Bikies mailing list [email protected] http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
