Tim,

 

As a point of clarification - The reason you have not seen a copy of the letter 
from the DNR is that there isn't a letter for a further delay until 2013 at the 
latest.  The Madison Water Utility did request a one year extension in 2009 to 
accommodate the Williamson Street reconstruction project delay from 2010 to 
2011 and the DNR granted the extension.  The utility now has until the end of 
2011 to complete the replacement of all lead pipes in its system.  As you may 
recall, 2010 was supposed to be the end of a ten year replacement project under 
the original consent agreement between the utility and the Wisconsin DNR.  
Robbie is correct, if the reconstruction project is delayed again, the utility 
will be replacing the lead services on Williamson Street in 2011.

Robin
  ----- Original Message ----- 
  From: tim wong 
  To: Robbie Webber 
  Cc: Bikies 
  Sent: Wednesday, October 20, 2010 3:58 PM
  Subject: Re: [Bikies] Willy St rebuild at Board of Public Works 
tonight(Wednesday)


  I haven't seen the letter, but I have been told that the DNR has signed off 
on a further delay in lead pipe removal until 2013 at the latest.  The 
Williamson St. reconstruction will happen between Blount St. and the Yahara 
River, so the rail construction, including the Blair-John No Lane-Williamson 
intersection, will not affect it.  In fact, Engineering was planning that 
traffic detour down the newly constructed Wmson St. around the Blair St.  This 
is something the neighborhood does NOT want, so those reconstructions should 
happen in the same year.

  The city has agreed to narrow Wmson west of Baldwin from 48 to 44, but the 
existing street east of Baldwin is 42 feet wide.  None of those widths--42, 44, 
or 48, qualify as a genuine "complete streets" street--all too narrow.


  On Wed, Oct 20, 2010 at 3:47 PM, Robbie Webber <[email protected]> 
wrote:

    Marsha wants to delay, but there is a federal mandate to replace the lead 
pipes next year. So we either get the street torn up twice, or once. And there 
is no way to do Willy St in 2012 because of other construction to be done in 
that year - including the rail construction. That means a several-year delay, 
not one year. Again, the pipes will definitely be replaced next year, so Willy 
will be torn up  next year.


    I acknowledge that there are advantages to narrowing the street, and I 
tried to outline them. I mostly wanted people to be aware that this is coming 
up TONIGHT. The current plan is 44 feet, not 42, so you can come and speak or 
not, but tonight is the night. As I said, there are trade-offs, and not 
everyone may agree whether those trade-offs are worth it.


    Marsha will not be at the meeting, because she has another one that she 
cannot miss. 



    As to the "East side biking community" agreeing on this, I do not remember 
this ever coming up on this list, nor do I remember others asking other 
bicyclists that may use the area but not live there. Willy St is used by more 
than just the neighbors, and not all the bicyclists were consulted, as far as I 
can tell.


    Again, I am trying to provide information, so that anyone on this list can 
make their own decisions if they want to speak to the issue.

    Robbie Webber
    Bike Walk Madison Steering Committee
      www.bikewalkmadison.org
    Join our group on Facebook!





    On Wed, Oct 20, 2010 at 3:32 PM, tim wong <[email protected]> wrote:

      Robbie has several things wrong on this.  The east-side bicycling 
community has been involved in this green streets redesign effort.  We strongly 
support the narrowing of the street, but, in addition, are urging the city to 
delay this reconstruction until 2012 so that we can get the "green streets" 
thing right--essentially a reversal of 60+ years of doing streets 
reconstructions wrong, i.e., making streets wider, faster, and mostly designed 
to get people to the suburbs faster.

      I will forward a letter we wrote to the city endorsing the narrower 
street after this.  The short of it is that there are three bicycling 
alternatives within two blocks of Williamson St.  In addition, Wmson east of 
Baldwin is 42 feet wide, and no one is advocating widening it.

      The other reason to support narrowing is that it allows for wider 
terraces, which permits taller trees to be planted, which provide more of a 
canopy, which has been show to slow cars down, as well as more bike racks and 
tables for restaurants who want outside seating.  We are also hoping to have 
the utilities undergrounded during reconstruction.  The conduit is being put in 
the ground, but the wires will stay above-ground, meaning the trees will 
continue to be butchered by MGE, cable companies, etc.

      If the east-rail bike path, Jenifer, and Spaight were not so close, I 
might not support this narrowing.  But they are, so I do.

      I would strong urge all interested advocates, and especially 6th district 
residents, to e-mail or call Marsha and urge her to support a delay until 2012. 
 So far she is standing with the city against the interests of the neighborhood 
(it's a little more complicated than it looks).  Marquette Neighborhood 
Association and Schenk Atwood Starkweather Yahara (SASY) neighborhood council 
have both endorsed the delay, MNA unanimously and SASY with one dissenting 
vote.  The alder, so far, is supporting Rob Phillips and Engineering in their 
opposition to delay.  Your e-mails and calls might persuade her to support the 
delay.  Thanks.

      tim


      On Wed, Oct 20, 2010 at 2:34 PM, Robbie Webber <[email protected]> 
wrote:

        Just an FYI that the rebuild of Williamson St will be at the Board of 
Public Works tonight, in case anyone wants to weigh in on the new design. It 
looks like the public hearing will start at 6:30 PM, if I am reading the 
schedule correctly. It is item # 7 on the agenda linked below.


        
http://legistar.cityofmadison.com/meetings/2010/10/8326_A_BOARD_OF_PUBLIC_WORKS_10-10-20_Agenda.pdf


        The Board of Public Works meets at the Water Utility Bldg - 119 Olin 
Ave.



        Sorry for the late notice, but this sort of crept up on me, (and I'm no 
longer a paid bike advocate or alder.)


        The reason that this particular street rebuild might require extra 
attention is that the proposal is to NARROW the street, which could have 
implications for all street users. 


        Right now the curb-to-curb width is 48 feet. The outside lane - shared 
by parked cars and bicyclists most of the day, and an active car travel lane 
during rush hour - is 13 feet. The inside lane is 11 feet.


        The new design would narrow the street to 44 feet, and the current 
proposal would be 4 lanes, each 11 feet. This will mean that the outside lane 
will no longer be wide enough for bicyclists and parked cars to safely share. 
The options for bicyclists on Willy St would be A) get in the active car 
(inside) lane, or B) ride really close to the parked cars and be passed 
unsafely by car on the street.


        The advantage of narrowing the street is that there will be more space 
for trees and other "street amenities," which Willy St sorely lacks. More space 
for walking, sidewalk cafes, bike racks, benches, etc. Presumably, the traffic 
will move more slowly as well.


        This is a definitely trade-off: worse for bicyclists, but better for 
the overall look and feel of the street. I am of very mixed feelings about 
this. 


        Beyond where the curbs are placed, there is the matter of where the 
lane marking are drawn, which is not being decided tonight. I will be pushing 
for making the outside lanes 12 feet instead of 11. This would still be a tight 
squeeze for a parked car-bicyclist to share, but it is an additional foot.







        Robbie Webber
        Bike Walk Madison Steering Committee
          www.bikewalkmadison.org
        Join our group on Facebook!





        _______________________________________________
        Bikies mailing list
        [email protected]
        http://lists.danenet.org/listinfo.cgi/bikies-danenet.org





      -- 
      If you would like to sign a petition opposing Williamson St. Coop's 
permanent driveway, go to the link 
http://www.PetitionOnline.com/coop9876/petition.html .Even if you've signed the 
paper copy, sign this one especially if you have a comment to add.  Or buy a 
T-shirt:  STOP THE DRIVEWAY.  Inquire here.







  -- 
  If you would like to sign a petition opposing Williamson St. Coop's permanent 
driveway, go to the link http://www.PetitionOnline.com/coop9876/petition.html 
.Even if you've signed the paper copy, sign this one especially if you have a 
comment to add.  Or buy a T-shirt:  STOP THE DRIVEWAY.  Inquire here.




------------------------------------------------------------------------------


  _______________________________________________
  Bikies mailing list
  [email protected]
  http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org

Reply via email to