I generally ignore the "dismount and walk signs" and feel the same way that Mike does. When vehicle drivers have to walk their cars through construction zones I'll follow the same rule of the road for my bike.

Brian Mink

Michael Rewey <mailto:[email protected]>
August 28, 2014 at 5:28 PM
I await the day when a construction announcement states that drivers will have to walk their
cars through a construction zone.

Mike Rewey


On 28 Aug 2014 at 21:21, Ross, Arthur wrote:

NOTICE: REVISED SCHEDULE ON PATH WORK - There will be construction work on the Southwest Path between Randall Ave and Park Street, beginning Tuesday, September 2 and continuing through Friday, September 5. The City´s sidewalk contractor will be replacing street ramps at various locations. Ramps will be replaced half at a time so that the path will remain open for use, but riders will have to dismount and walk bikes through the construction zones. Please be aware and use caution when riding or walking through this
area. For questions contact Tony Fernandez in Engineering at
[email protected].


Arthur Ross, Pedestrian-Bicycle Coordinator
City of Madison Traffic Engineering Division
215 Martin Luther King, Jr. Blvd., Suite 100
PO Box 2986
Madison, WI 53701-2986
608/266-6225


_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
Ross, Arthur <mailto:[email protected]>
August 28, 2014 at 4:21 PM
NOTICE: REVISED SCHEDULE ON PATH WORK - There will be construction work on the Southwest Path between Randall Ave and Park Street, beginning Tuesday, September 2 and continuing through Friday, September 5. The City's sidewalk contractor will be replacing street ramps at various locations. Ramps will be replaced half at a time so that the path will remain open for use, but riders will have to dismount and walk bikes through the construction zones. Please be aware and use caution when riding or walking through this area. For questions contact Tony Fernandez in Engineering at [email protected]<mailto:[email protected]>.


Arthur Ross, Pedestrian-Bicycle Coordinator
City of Madison Traffic Engineering Division
215 Martin Luther King, Jr. Blvd., Suite 100
PO Box 2986
Madison, WI 53701-2986
608/266-6225


_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org

Reply via email to