I generally ignore the "dismount and walk signs" and feel the same way
that Mike does. When vehicle drivers have to walk their cars through
construction zones I'll follow the same rule of the road for my bike.
Brian Mink
Michael Rewey <mailto:[email protected]>
August 28, 2014 at 5:28 PM
I await the day when a construction announcement states that drivers
will have to walk their
cars through a construction zone.
Mike Rewey
On 28 Aug 2014 at 21:21, Ross, Arthur wrote:
NOTICE: REVISED SCHEDULE ON PATH WORK - There will be construction
work on the
Southwest Path between Randall Ave and Park Street, beginning Tuesday,
September 2 and
continuing through Friday, September 5. The City´s sidewalk contractor
will be replacing
street ramps at various locations. Ramps will be replaced half at a
time so that the path
will remain open for use, but riders will have to dismount and walk
bikes through the
construction zones. Please be aware and use caution when riding or
walking through this
area. For questions contact Tony Fernandez in Engineering at
[email protected].
Arthur Ross, Pedestrian-Bicycle Coordinator
City of Madison Traffic Engineering Division
215 Martin Luther King, Jr. Blvd., Suite 100
PO Box 2986
Madison, WI 53701-2986
608/266-6225
_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
Ross, Arthur <mailto:[email protected]>
August 28, 2014 at 4:21 PM
NOTICE: REVISED SCHEDULE ON PATH WORK - There will be construction
work on the Southwest Path between Randall Ave and Park Street,
beginning Tuesday, September 2 and continuing through Friday,
September 5. The City's sidewalk contractor will be replacing street
ramps at various locations. Ramps will be replaced half at a time so
that the path will remain open for use, but riders will have to
dismount and walk bikes through the construction zones. Please be
aware and use caution when riding or walking through this area. For
questions contact Tony Fernandez in Engineering at
[email protected]<mailto:[email protected]>.
Arthur Ross, Pedestrian-Bicycle Coordinator
City of Madison Traffic Engineering Division
215 Martin Luther King, Jr. Blvd., Suite 100
PO Box 2986
Madison, WI 53701-2986
608/266-6225
_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org