It's not entirely clear from the documentation or these posts, but is it 
possible to have more than one queue per project? Currently a build is 
triggered for a project and if a developer checks something in, a build for 
that CL won't be triggered until the current build finishes. In this case, 
I want two queues for this project (or more if I want) so the second CL is 
built in parallel to the first.
 
Is this possible?

-- 

--- 
You received this message because you are subscribed to the Google Groups 
"ccnet-user" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.

Reply via email to