Hi

I appreciate running the builds on the same machine would cause a problem, but 
when a build is triggered on our system it calls a batch file which triggers a 
build on a remote machine. So for my setup being able to have multiple queues 
would be useful. But I appreciate it's probably not a common setup.

Regards

________________________________
Mark Barnard *  Head of Infrastructure Technology, Risk Products * Adaptiv * 
Capital Markets * SunGard
25 Canada Square, Canary Wharf, London E14 5LQ, UK
Tel + 44 (0) 20 8081 2827 * Mobile +44 (0) 78 0197 7870 * Fax +44 (0) 20 8081 
2680 * [email protected]<mailto:[email protected]> * 
www.sungard.com/adaptiv<http://www.sungard.com/>

[cid:[email protected]]<http://www.sungard.com/ten>
________________________________
SunGard Systems Ltd. * Registered in England and Wales No. 1937159 * Registered 
Office: 25 Canada Square, London E14 5LQ.
________________________________
CONFIDENTIALITY: This e-mail (including any attachments) may contain 
confidential, proprietary and privileged information, and unauthorized 
disclosure or use is prohibited.  If you receive this e-mail in error, please 
notify the sender and delete this e-mail from your system.

[cid:[email protected]]

From: [email protected] [mailto:[email protected]] On 
Behalf Of Ruben Willems
Sent: 18 December 2013 11:10
To: [email protected]
Subject: Re: [ccnet-user] Multiple Queue's Per Project

Hi
it's not possible.
There can be only 1 Q for a project
keep in mind that the working directory would be the same if that option 
existed.
files being overwritten on compile time
--> bad idea



with kind regards
Ruben Willems



On 18 December 2013 01:55, Barney 
<[email protected]<mailto:[email protected]>> wrote:
It's not entirely clear from the documentation or these posts, but is it 
possible to have more than one queue per project? Currently a build is 
triggered for a project and if a developer checks something in, a build for 
that CL won't be triggered until the current build finishes. In this case, I 
want two queues for this project (or more if I want) so the second CL is built 
in parallel to the first.

Is this possible?
--

---
You received this message because you are subscribed to the Google Groups 
"ccnet-user" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to 
[email protected]<mailto:ccnet-user%[email protected]>.
For more options, visit https://groups.google.com/groups/opt_out.

--

---
You received this message because you are subscribed to the Google Groups 
"ccnet-user" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to 
[email protected]<mailto:[email protected]>.
For more options, visit https://groups.google.com/groups/opt_out.

-- 

--- 
You received this message because you are subscribed to the Google Groups 
"ccnet-user" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.

<<inline: image001.png>>

<<inline: image002.png>>

Reply via email to