Hi it's not possible. There can be only 1 Q for a project
keep in mind that the working directory would be the same if that option existed. files being overwritten on compile time --> bad idea with kind regards Ruben Willems On 18 December 2013 01:55, Barney <[email protected]> wrote: > It's not entirely clear from the documentation or these posts, but is it > possible to have more than one queue per project? Currently a build is > triggered for a project and if a developer checks something in, a build for > that CL won't be triggered until the current build finishes. In this case, > I want two queues for this project (or more if I want) so the second CL is > built in parallel to the first. > > Is this possible? > > -- > > --- > You received this message because you are subscribed to the Google Groups > "ccnet-user" group. > To unsubscribe from this group and stop receiving emails from it, send an > email to [email protected]. > For more options, visit https://groups.google.com/groups/opt_out. > -- --- You received this message because you are subscribed to the Google Groups "ccnet-user" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. For more options, visit https://groups.google.com/groups/opt_out.
