On Nov 1, 2007, at 3:00 PM, Jared Rhine wrote:

So run part of the process (svnlook diff) twice to first capture the size, and later as part of the email generation? And then drop the diff switch if it's larger than 300k?

If Bear's ok with it, I think the above would do a pretty reasonable job.


+1

--
bear

Build and Release Engineer
Open Source Applications Foundation (OSAF)
[EMAIL PROTECTED]
http://www.osafoundation.org

[EMAIL PROTECTED]
http://code-bear.com



_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Open Source Applications Foundation "chandler-dev" mailing list
http://lists.osafoundation.org/mailman/listinfo/chandler-dev

Reply via email to