We're doing an eval on some PowerConnect 7048P switches, and have run into 
spanning tree issues.  They don't like PVST, but will spit out STP that "in 
theory" will revert a Cisco to STP (is this process contagious?  or limited to 
the upstream?).

That unfortunately requires an untagged vlan 1 on all trunk ports (breaks our 
standards and would require a mass reconfiguration).

You can also try MST if you want to convert (again, breaks our standards and 
would require a mass reconfiguration).

Otherwise they seem quite tolerable and have some attractive features...  but 
I'm not quite sold if it requires a campus-wide mass reconfiguration to get 
along with existing gear.

Jeff
_______________________________________________
cisco-nsp mailing list  [email protected]
https://puck.nether.net/mailman/listinfo/cisco-nsp
archive at http://puck.nether.net/pipermail/cisco-nsp/

Reply via email to