We use cable management bars and route all cables to the left and right thus 
ensuring that we don't have cables blocking the removal of a failed module or a 
module that needs swapping out for upgrade. Would recommend wider racks for 
such locations . You have more space to each side and often containment channels

alan



-------- Original message --------
From: Jon Lewis <[email protected]>
Date: 08/07/2013 13:11 (GMT+00:00)
To: chris stand <[email protected]>
Cc: [email protected]
Subject: Re: [c-nsp] Cisco 6500 mounting with cables


On Mon, 8 Jul 2013, chris stand wrote:

> Does anyone mount 6500s directly under the patch panels ?  If you do, do
> the cables run to the left and right and would you share a photo or two ?

I've run cables in from both sides.  You can get cable management bars
that rack mount on top of the 6500 chassis rack ears.  These are literally
a steel bar with 2 radiused 90* bends, the ends of which are welded to
"rack ears".  Mounting these in front of the line cards, you can then use
velcro to secure the cables on their way to the line card ports.

----------------------------------------------------------------------
  Jon Lewis, MCP :)           |  I route
                              |  therefore you are
_________ http://www.lewis.org/~jlewis/pgp for PGP public key_________
_______________________________________________
cisco-nsp mailing list  [email protected]
https://puck.nether.net/mailman/listinfo/cisco-nsp
archive at http://puck.nether.net/pipermail/cisco-nsp/
_______________________________________________
cisco-nsp mailing list  [email protected]
https://puck.nether.net/mailman/listinfo/cisco-nsp
archive at http://puck.nether.net/pipermail/cisco-nsp/

Reply via email to