You can code the full time spent in a group, if the group did not exceed four residents, and the resident did not exceed 25% of their therapy time per discipline in group.

 

See this excerpt from page 3-188 from the revised August �03 RAI User�s Manual:

 

For groups of four or fewer residents per supervising therapist (or assistant), each resident is coded at having received the full time in the therapy session. For example, if a resident worked with three residents for 45 minutes on training to return to the community, each resident received 45 minutes of therapy so long as that does not exceed 25% of his/her therapy per therapy discipline, during the 7-day observation period. Remember, code for the resident�s time, not for the therapist�s time.

 

 



Lisa Pippin <[EMAIL PROTECTED]> wrote:

I would like to see how everyone checks therapy min. If therapy is working in a group with residents do you add all min for the last 7 days including the group time and then times it by .25 % and subtract from your total? If someone has a formula please send it?

 

Thanks Lisa

Confidentiality Notice:

This e-mail message, including any attachments, is for the sole use of the intended recipient and may contain confidential and privileged information. Any unauthorized review, use, disclosure, or distribution is prohibited. If you are not the intended recipient, please contact Lisa Pippin by reply e-mail and destroy all copies of the original message.

Shannon Medical Center


Do you Yahoo!?
Yahoo! Mail SpamGuard - Read only the mail you want.

Reply via email to