[
https://issues.apache.org/jira/browse/HADOOP-4018?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12628257#action_12628257
]
Vinod Kumar Vavilapalli commented on HADOOP-4018:
-------------------------------------------------
Ok, guess I was wrong. LimitTasksPerJobTaskScheduler limits the tasks running
per job in the cluster. It doesn't help preventing any jobtracker stall. But
still, this looks something that should be handled by a scheduler to me -
perhaps the scheduler should bail out while initializing a job with huge number
of tasks.
> limit memory usage in jobtracker
> --------------------------------
>
> Key: HADOOP-4018
> URL: https://issues.apache.org/jira/browse/HADOOP-4018
> Project: Hadoop Core
> Issue Type: Bug
> Components: mapred
> Reporter: dhruba borthakur
> Assignee: dhruba borthakur
> Attachments: maxSplits.patch, maxSplits2.patch, maxSplits3.patch,
> maxSplits4.patch, maxSplits5.patch, maxSplits6.patch
>
>
> We have seen instances when a user submitted a job with many thousands of
> mappers. The JobTracker was running with 3GB heap, but it was still not
> enough to prevent memory trashing from Garbage collection; effectively the
> Job Tracker was not able to serve jobs and had to be restarted.
> One simple proposal would be to limit the maximum number of tasks per job.
> This can be a configurable parameter. Is there other things that eat huge
> globs of memory in job Tracker?
--
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.