Could you replicate the database and test the upgrade to see just how
long it would take (if everything else hitting the database was off)?

On 12/1/2006, "Rod K" <[EMAIL PROTECTED]> wrote:

>I'm currently running dbmail 2.0.11 on a live server with about 15GB of
>current email.  I need to upgrade to 2.2.
>
>The problem is that the postgres migrate script is going to take a long
>time to run with that much email and really, really don't want to take
>down the server for that long.  Is there any issues with leaving 2.0.11
>running while migration is going on or once complete before shutting
>down 2.0.11 and restarting with 2.2?
>
>TIA