Could you replicate the database and test the upgrade to see just how long it would take (if everything else hitting the database was off)?
On 12/1/2006, "Rod K" <[EMAIL PROTECTED]> wrote: >I'm currently running dbmail 2.0.11 on a live server with about 15GB of >current email. I need to upgrade to 2.2. > >The problem is that the postgres migrate script is going to take a long >time to run with that much email and really, really don't want to take >down the server for that long. Is there any issues with leaving 2.0.11 >running while migration is going on or once complete before shutting >down 2.0.11 and restarting with 2.2? > >TIA >_______________________________________________ >DBmail mailing list >[email protected] >https://mailman.fastxs.nl/mailman/listinfo/dbmail >
