Thanks so much for your valuable comments. We are using Jenkins operator to orchestrate the Jenkins build from airflow.
The thing is that our base line workloads start in 3 phases to build our Jenkins jobs and never stop, for example, phase 1 workload starts in day 1 while phase 2 workload starts in day 3 without the stopping of the day 1 workload (and the they must be running at same time after day 3), we will use Xcom and sensor like you mentioned to see if it works. Some other questions are also listed in below, please check. 1st, Can we set different scheduler for DAGs and its sub DAGs, e.g. DAGs are triggered weekly, but sub DAGs are triggered hourly? 2nd, Is there any way to export the Graph view/Tree view from the airflow UI? 3rd, How can we add delay between tasks in one DAG besides sensor? Thanks and best regards Larry Wang From: Wang, Larry Sent: Monday, September 25, 2017 2:23 PM To: 'Gerard Toonstra' <[email protected]>; '[email protected]' <[email protected]>; Wang, Ming <[email protected]>; Ren, Xiaoyu <[email protected]> Subject: RE: Qs on airflow From: Gerard Toonstra [mailto:[email protected]] Sent: Monday, September 25, 2017 2:01 PM To: [email protected]<mailto:[email protected]>; Wang, Larry <[email protected]<mailto:[email protected]>> Subject: Re: Qs on airflow Hi Larry, The important thing to question is what kind of interface that other system has. It is a little bit unusual in the sense that this DAG processes across multiple days. The potential issue I foresee here is that you don't mention a consistent start date for the DAG and you expect this to run in an ad-hoc manner. Most DAGs would process "windows" of activity and you may get some issues with the time always resetting to the defined scheduled start of the DAG. What most DAGs would do to enable this is to have sensor tasks in the DAG. A Hadoop job for example executes asynchronously from the originating request. You'd have a task to kick off the job, save the job id and then in another task fetch the job id through xcom and continue polling using this sensor task to verify if the job finished (with either failed or finished). Then you allow the DAG to continue or fail. So this is where the job interface question comes into play. It depends what you have available to verify the status of jobs and then you'd probably write some operators around that job interface. If these jobs never surpass a week, then you could start defining a week interval, so you're never crossing these boundaries. Then look into for example the LatestOnlyOperator on how you can get the left-most execution date (datetime) when the dagrun was started. There should be other ways to get the exact start/datetime of the task of your interest (when the job was started), then figure out the total processing time you need. Then run that sensor every hour in a retry or something. Alternatives are to look at what these tasks produce. For example, if you drop files into S3 at the end of a process, look for those artifacts as a means to identify if the task succeeded or failed. Or perhaps even easier, write control files in each workload that you can check for in airflow, which can be easier than having to implement a job control interface thingy. You could also start the DAG and rely on 'retry' functionality in airflow and then you calculate what interval size and how many retries you need to get to 3 days in total, after which that task fails. Rgds, Gerard On Mon, Sep 25, 2017 at 3:41 AM, Wang, Larry <[email protected]<mailto:[email protected]>> wrote: Any updates on this? we basically want to build following DAG, and the group of BBTs in rectangle( start with snap should be triggered in daily basis) From: Wang, Larry Sent: Sunday, September 24, 2017 11:23 PM To: '[email protected]<mailto:[email protected]>' <[email protected]<mailto:[email protected]>> Subject: Qs on airflow Hi experts, I am new to airflow and want to ask some questions of it to see if it is possible to leverage this tool in our daily works, please check them in below. 1st, I am implementing a system with 3 level workloads, the 1st workloads is triggered at day 1, and then the 2nd workload is triggered at day 3 only if the 1st job could run long enough with 3 days and then the last workload will be trigger at day 5 if both previous workloads could continue running. Is this possible mapping to DAGs of the airflow? 2nd, Given the 1st workloads warming up and keep consuming certain system resources, a bunch operation will be kicked out in a queue, is it possible? Thanks and best regards Larry Wang