Hi experts,

I am new to airflow and want to ask some questions of it to see if it is 
possible to leverage this tool in our daily works, please check them in below.

1st, I am implementing a system with 3 level workloads, the 1st workloads is 
triggered at day 1, and then the 2nd workload is triggered at day 3 only if the 
1st job could run long enough with 3 days and then the last workload will be 
trigger at day 5 if both previous workloads could continue running. Is this 
possible mapping to DAGs of the airflow?

2nd, Given the 1st workloads warming  up and  keep consuming certain system 
resources, a bunch operation will be kicked out in a queue, is it possible?

Thanks and best regards
Larry  Wang

Reply via email to