+1 for starting the release process in time
> Note that we need to temporarily revert
https://github.com/apache/beam/pull/6683 before the release branch cut
per the discussion
+1
Thanks,
Max
On 16.11.18 07:53, Charles Chen wrote:
+1
Note that we need to temporarily revert
https://github.com/apache/beam/pull/6683 before the release branch cut
per the discussion at
https://lists.apache.org/thread.html/78fe33dc41b04886f5355d66d50359265bfa2985580bb70f79c53545@%3Cdev.beam.apache.org%3E
On Thu, Nov 15, 2018 at 9:18 PM Tim <[email protected]
<mailto:[email protected]>> wrote:
Thanks Cham
+1
On 16 Nov 2018, at 05:30, Thomas Weise <[email protected]
<mailto:[email protected]>> wrote:
+1
On Thu, Nov 15, 2018 at 4:34 PM Ahmet Altay <[email protected]
<mailto:[email protected]>> wrote:
+1 Thank you.
On Thu, Nov 15, 2018 at 4:22 PM, Kenneth Knowles
<[email protected] <mailto:[email protected]>> wrote:
SGTM. Thanks for keeping track of the schedule.
Kenn
On Thu, Nov 15, 2018 at 1:59 PM Chamikara Jayalath
<[email protected] <mailto:[email protected]>> wrote:
Hi All,
According to the release calendar [1] branch cut date
for Beam 2.9.0 release is 11/21/2018. Since previous
release branch was cut close to the respective
calendar date I'd like to propose cutting release
branch for 2.9.0 on 11/21/2018. Next week is
Thanksgiving holiday in US and possibly some folks
will be out so we can try to produce RC1 on Monday
after (11/26/2018). We can attend to current blocker
JIRAs [2] in the meantime.
I'd like to volunteer to perform this release.
WDYT ?
Thanks,
Cham
[1]
https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
[2] https://s.apache.org/beam-2.9.0-burndown