On Thu, Nov 15, 2018 at 10:53 PM Charles Chen <c...@google.com> wrote:

> +1
>
> Note that we need to temporarily revert
> https://github.com/apache/beam/pull/6683 before the release branch cut
> per the discussion at
> https://lists.apache.org/thread.html/78fe33dc41b04886f5355d66d50359265bfa2985580bb70f79c53545@%3Cdev.beam.apache.org%3E
>
>
Since it is for the release I would prefer this to be done in the release
branch, and not in master.





> On Thu, Nov 15, 2018 at 9:18 PM Tim <timrobertson...@gmail.com> wrote:
>
>> Thanks Cham
>> +1
>>
>> On 16 Nov 2018, at 05:30, Thomas Weise <t...@apache.org> wrote:
>>
>> +1
>>
>>
>> On Thu, Nov 15, 2018 at 4:34 PM Ahmet Altay <al...@google.com> wrote:
>>
>>> +1 Thank you.
>>>
>>> On Thu, Nov 15, 2018 at 4:22 PM, Kenneth Knowles <k...@apache.org>
>>> wrote:
>>>
>>>> SGTM. Thanks for keeping track of the schedule.
>>>>
>>>> Kenn
>>>>
>>>> On Thu, Nov 15, 2018 at 1:59 PM Chamikara Jayalath <
>>>> chamik...@google.com> wrote:
>>>>
>>>>> Hi All,
>>>>>
>>>>> According to the release calendar [1] branch cut date for Beam 2.9.0
>>>>> release is 11/21/2018. Since previous release branch was cut close to the
>>>>> respective calendar date I'd like to propose cutting release branch for
>>>>> 2.9.0 on 11/21/2018. Next week is Thanksgiving holiday in US and possibly
>>>>> some folks will be out so we can try to produce RC1 on Monday after
>>>>> (11/26/2018). We can attend to current blocker JIRAs [2] in the meantime.
>>>>>
>>>>> I'd like to volunteer to perform this release.
>>>>>
>>>>> WDYT ?
>>>>>
>>>>> Thanks,
>>>>> Cham
>>>>>
>>>>> [1]
>>>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>>>>> [2] https://s.apache.org/beam-2.9.0-burndown
>>>>>
>>>>>
>>>