Hrmm, before I forget, let's give some more thought to the generated
code. I'll think about this (search around for some tools) and spin off
a different thread to figure out how to ease that.
I don't think any of my open PRs are inherently dependent on each other
(I always re-branched from master when starting a new issue). I would
hope that the .proto files merge cleanly and the Java just needs to be
regenerated.
If you want to treat GH as the review tool, I can just make a big PR
with multiple properly-named commits and relieve the merge-pain (like
you suggested on CALCITE-645).
Julian Hyde wrote:
And 913 too.
This is depressing.
On Wed, Oct 21, 2015 at 1:55 PM, Julian Hyde<[email protected]> wrote:
Ah, 645 and 903 also need protobuf changes. They're both yours Josh.
Let me know what order you would like me to commit these PRs.
On Wed, Oct 21, 2015 at 1:04 PM, Julian Hyde<[email protected]> wrote:
Because we check in code generated by protobuf, merging commits that affects
protobuf is not possible. (Grrr. I knew there was a reason not to check in
generated code.)
Several of these patches touch protobuf: including 908, 912, 871 (which relies
on 912). Any more?
If we want to get all of these patches into 1.5, you will need to be responsive.
Josh& Bruno, please get together and figure out which order your patches
should be committed, and email this list when you have the first pull request. Base
it on the latest master, which will shortly contain CALCITE-927.
Julian
On Oct 20, 2015, at 12:08 PM, Josh Elser<[email protected]> wrote:
I've been trying to track some of the outstanding pull requests for
Avatica-related fixes. I'd love to see this list included in 1.5.
https://issues.apache.org/jira/browse/CALCITE-927
https://issues.apache.org/jira/browse/CALCITE-921
https://issues.apache.org/jira/browse/CALCITE-919
https://issues.apache.org/jira/browse/CALCITE-913
https://issues.apache.org/jira/browse/CALCITE-912
https://issues.apache.org/jira/browse/CALCITE-908
https://issues.apache.org/jira/browse/CALCITE-903
https://issues.apache.org/jira/browse/CALCITE-871
https://issues.apache.org/jira/browse/CALCITE-645
I think most of them are in a good position, a few might require some more
polishing.
- Josh
Julian Hyde wrote:
When would be a good time for our next release?
Here are some dates:
* We aim to release "every month or so".
* 1.4 was released on 9/2 [1].
* It takes about 2 weeks to release, so if we started today, we could
release on about 10/13.
* The Apache board meeting is on 10/14 [2] and if the vote to
establish Calcite passes we would make our first release as a
top-level project as early as 10/21.
Does anyone have any other constraints, e.g. features they would like
to complete?
Jesus, could you take on the release manager role?
Julian
[1] http://calcite.incubator.apache.org/docs/history.html#v1-4-0
[2] http://www.apache.org/foundation/board/calendar.html