Bump ;)

Le mar. 5 févr. 2019 à 18:43, Jean-Marc Spaggiari <[email protected]>
a écrit :

> Hi all,
>
> When we will have a 2.2.0 RC I will give a try of the upgrade path from
> 2.0.x... do we have any idea when this will be out?
>
> JMS
>
> Le mar. 29 janv. 2019 02 h 09, Guanghao Zhang <[email protected]> a
> écrit :
>
>> Cut a new branch-2.2 at this commit.
>>
>> commit e736d78362253936492fb3bd16e614d14859281d
>> Author: Duo Zhang <[email protected]>
>> Date: Mon Jan 28 18:21:51 2019 +0800
>>
>> HBASE-21792 Mark HTableMultiplexer as deprecated and remove it in 3.0.0
>>
>> Signed-off-by: Michael Stack <[email protected]>
>>
>> Sean Busbey <[email protected]> 于2019年1月24日周四 上午9:45写道:
>>
>> > Okay it sounds like we definitely need a better doc about this as a
>> > starting point. I have some additional questions about failure handling;
>> > should we go through them here or in a jira about improving how upgrade
>> > from 2.0/2.1 gets handled?
>> >
>> > On Wed, Jan 23, 2019, 07:33 张铎(Duo Zhang) <[email protected] wrote:
>> >
>> > > Oh, you misunderstood me. It is just for master, you need make sure
>> that
>> > > before you killing the old version master, there is no RITs. And once
>> the
>> > > new master is up, everything is fine., as the new master will detect
>> if
>> > > there are old style AssignProcedure/UnassignProcedures, if so it will
>> > quit
>> > > immediately.
>> > >
>> > > Sean Busbey <[email protected]> 于2019年1月23日周三 下午9:21写道:
>> > >
>> > > > Yes, please. I don't think it's reasonable to expect no region
>> > > transitions
>> > > > during a rolling upgrade window; that would imply no servers can
>> crash
>> > > > during the upgrade.
>> > > >
>> > > > On Wed, Jan 23, 2019, 07:04 张铎(Duo Zhang) <[email protected]
>> > wrote:
>> > > >
>> > > > > From 1.x it is OK, but from 2.0 or 2.1, we need make sure that
>> there
>> > > are
>> > > > no
>> > > > > RITs ongoing. We could see if we can make the upgrading more
>> > smoothly.
>> > > > >
>> > > > > Guanghao Zhang <[email protected]> 于2019年1月23日周三 下午8:56写道:
>> > > > >
>> > > > > > Our new internal branch is based on branch-2. And we already
>> > rolling
>> > > > > > upgrade our staging cluster from our internal 0.98 branch to
>> it...
>> > I
>> > > > will
>> > > > > > take a try for 2.0.* to 2.2.0.
>> > > > > >
>> > > > > > Are you saying we need to make sure it can do this? Or are you
>> > > > > > > asserting that it already does?
>> > > > > > >
>> > > > > > It already does.
>> > > > > >
>> > > > > >
>> > > > > > Sean Busbey <[email protected]> 于2019年1月22日周二 下午9:48写道:
>> > > > > >
>> > > > > > > excellent! thanks for volunteering to get the 2.2 release line
>> > > going
>> > > > > > > Guanghao!
>> > > > > > >
>> > > > > > > > Need to add more document about how to rolling upgrade from
>> > > > > > > 2.0.* or 2.1.* to 2.2.*. Meanwhile, need document about how
>> > rolling
>> > > > > > upgrade
>> > > > > > > from 1.* to 2.2.*.
>> > > > > > >
>> > > > > > > Has anyone confirmed that rolling upgrade to 2.2.0 works? I
>> > thought
>> > > > it
>> > > > > > > couldn't because of the change to assignment handling classes?
>> > > > > > >
>> > > > > > > > Now HBCK2 tool support branch-2's region assignments,
>> > > > > > > too.
>> > > > > > >
>> > > > > > > Are you saying we need to make sure it can do this? Or are you
>> > > > > > > asserting that it already does?
>> > > > > > >
>> > > > > > > On Sun, Jan 20, 2019 at 10:25 PM Guanghao Zhang <
>> > > [email protected]>
>> > > > > > > wrote:
>> > > > > > > >
>> > > > > > > > Hi, all, there has been six months since we released 2.1.0.
>> And
>> > > > there
>> > > > > > are
>> > > > > > > > 429 issues which fixed version is 2.2.0[1]. Our internal
>> branch
>> > > > which
>> > > > > > > based
>> > > > > > > > branch-2 run ITBLL successfully recently. branch-2 is stable
>> > now
>> > > > and
>> > > > > it
>> > > > > > > is
>> > > > > > > > time to release 2.2.0. I volunteered to be the release
>> manager
>> > > for
>> > > > > the
>> > > > > > > 2.2
>> > > > > > > > release line. And plan to cut branch-2.2 from branch-2.
>> > > > > > > >
>> > > > > > > > For 2.2.0, the biggest change is about AMV2[2]: HBASE-20881
>> is
>> > an
>> > > > > > > > incompatible change and different implemenation with
>> branch-2.0
>> > > and
>> > > > > > > > branch-2.1. Need to add more document about how to rolling
>> > > upgrade
>> > > > > from
>> > > > > > > > 2.0.* or 2.1.* to 2.2.*. Meanwhile, need document about how
>> > > rolling
>> > > > > > > upgrade
>> > > > > > > > from 1.* to 2.2.*. Now HBCK2 tool support branch-2's region
>> > > > > > assignments,
>> > > > > > > > too.
>> > > > > > > >
>> > > > > > > > Another features will be included:
>> > > > > > > > 1. HBASE-20610 Procedure V2 - Distributed Log Splitting[3]
>> > > > > > > > 2. HBASE-21649 Complete Thrift2[4]
>> > > > > > > > 3. HBASE-16707 Improve throttling feature for production
>> > usage[5]
>> > > > > > > > 4. HBASE-20886 [Auth] Support keytab login in hbase
>> client[6]
>> > > > > > > > 5. HBASE-20636 Introduce two bloom filter type :
>> > > > > ROWPREFIX_FIXED_LENGTH
>> > > > > > > and
>> > > > > > > > ROWPREFIX_DELIMITED[7]
>> > > > > > > >
>> > > > > > > > Open a issue HBASE-21747 to release 2.2.0[8]. Suggestions
>> are
>> > > > > welcomed.
>> > > > > > > > Thanks.
>> > > > > > > >
>> > > > > > > > Best Regards,
>> > > > > > > > Guanghao
>> > > > > > > >
>> > > > > > > > [1]
>> > > > > > > >
>> > > > > > >
>> > > > > >
>> > > > >
>> > > >
>> > >
>> >
>> https://issues.apache.org/jira/browse/HBASE-21746?jql=project%20%3D%20HBASE%20AND%20fixVersion%20%3D%202.2.0
>> > > > > > > > [2] https://issues.apache.org/jira/browse/HBASE-20881
>> > > > > > > > [3] https://issues.apache.org/jira/browse/HBASE-20610
>> > > > > > > > [4] https://issues.apache.org/jira/browse/HBASE-21649
>> > > > > > > > [5] https://issues.apache.org/jira/browse/HBASE-16707
>> > > > > > > > [6] https://issues.apache.org/jira/browse/HBASE-20886
>> > > > > > > > [7] https://issues.apache.org/jira/browse/HBASE-20636
>> > > > > > > > [8] https://issues.apache.org/jira/browse/HBASE-21747
>> > > > > > >
>> > > > > >
>> > > > >
>> > > >
>> > >
>> >
>>
>