[ 
https://issues.apache.org/jira/browse/ISIS-1979?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16608093#comment-16608093
 ] 

ASF subversion and git services commented on ISIS-1979:
-------------------------------------------------------

Commit 7baf89b4b278193cbcb01d7ee691f8c7175b682f in isis's branch 
refs/heads/master from [~hobrom]
[ https://gitbox.apache.org/repos/asf?p=isis.git;h=7baf89b ]

Merge pull request #122 from blaugold/ISIS-1979

ISIS-1979: Refactor logging in headless runtime and prevent configuri…

> Integration test logging includes a lot of log events twice.
> ------------------------------------------------------------
>
>                 Key: ISIS-1979
>                 URL: https://issues.apache.org/jira/browse/ISIS-1979
>             Project: Isis
>          Issue Type: Bug
>          Components: Archetype: SimpleApp
>    Affects Versions: 2.0.0-M1
>            Reporter: Andi Huber
>            Assignee: Andi Huber
>            Priority: Major
>             Fix For: 2.0.0-M2
>
>
> As reported by Gabriel Terwesten <[email protected]> [1]
> During the bootstrapping of Isis for the integration test there seem to be 
> two appenders. The lines starting with the current time come from the 
> appender configured in `logging-integtest.properties`. I was not able to 
> understand where the second appender is configured. This is not a big problem 
> just a bit distracting.
> [1] 
> https://lists.apache.org/thread.html/cd92d8cd28ae877104fc965f83ca90b98e2e8188f464b65181e79a27@%3Cusers.isis.apache.org%3E



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to