Pierre Smits created OFBIZ-5296:
-----------------------------------

             Summary: AtP of products should be adjusted when production run is 
confirmed
                 Key: OFBIZ-5296
                 URL: https://issues.apache.org/jira/browse/OFBIZ-5296
             Project: OFBiz
          Issue Type: Improvement
          Components: manufacturing, product
    Affects Versions: SVN trunk
            Reporter: Pierre Smits


When a production run is confirmed we know what is intended to go in the 
production run (the components or ingredients aka the raw materials) and what 
is intended to go out (the finished product).

Unlike with an order, the AtP (Availability to Promise) of the goods involved 
does not get adjusted. 
The result is that requirements for PO or even the PO itself get generated to 
late (at the moment when QoH reaches minimum stock in stead of when AtP reaches 
minimum stock).

Following scenarios need to be resolved:
1. On confirmation of the production run (action = Confirm), the AtP of the 
product to be produced must increase and the AtP of materials needed must 
decrease.

2. When production is running and materials have been released to the 
production run, it is possible to return materials back to inventory. When 
doing so, the AtP of the materials must be adjusted accordingly with the same 
date-time and quantity as the returned materials.

3. When a production run has rejected end products the AtP of the end product 
must be adjusted with the same date-time and quantity as the declaration of the 
rejected product.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to