See my previous comments on the mailing list. I disagre with this behaviour.
The current behaviour reflects reality much better (I do not say this is ideal). Taking raw materials out and putting inexistent stock in at the confirmation of a production will result in incorrect accounts for both, raws and end products, If we touch this, I suggest we check out inventory when work actually begins (this is NOT when the prodrun is confirmed, but rather when the first actual routing task is started) and allow to return a fraction of checked out inventory when a prod run is cancelled. The end product should only be added to stock/inventory when the prod run is confirmed (allowing for example a QA function to confirm the Prod run and add only the fraction of end products that have passed QA. Both, the check out of raw as well as the confirmation of end products work in OFBiz as described above. Thus this JIra record should focus at the inventory behaviour when production runs are cancelled. Regards Carsten ------Original Message------ From: Pierre Smits (JIRA) To: [email protected] ReplyTo: [email protected] Subject: [jira] [Created] (OFBIZ-5296) AtP of products should be adjusted when production run is confirmed Sent: Aug 20, 2013 14:09 Pierre Smits created OFBIZ-5296: ----------------------------------- Summary: AtP of products should be adjusted when production run is confirmed Key: OFBIZ-5296 URL: https://issues.apache.org/jira/browse/OFBIZ-5296 Project: OFBiz Issue Type: Improvement Components: manufacturing, product Affects Versions: SVN trunk Reporter: Pierre Smits When a production run is confirmed we know what is intended to go in the production run (the components or ingredients aka the raw materials) and what is intended to go out (the finished product). Unlike with an order, the AtP (Availability to Promise) of the goods involved does not get adjusted. The result is that requirements for PO or even the PO itself get generated to late (at the moment when QoH reaches minimum stock in stead of when AtP reaches minimum stock). Following scenarios need to be resolved: 1. On confirmation of the production run (action = Confirm), the AtP of the product to be produced must increase and the AtP of materials needed must decrease. 2. When production is running and materials have been released to the production run, it is possible to return materials back to inventory. When doing so, the AtP of the materials must be adjusted accordingly with the same date-time and quantity as the returned materials. 3. When a production run has rejected end products the AtP of the end product must be adjusted with the same date-time and quantity as the declaration of the rejected product. -- This message is automatically generated by JIRA. If you think it was sent incorrectly, please contact your JIRA administrators For more information on JIRA, see: http://www.atlassian.com/software/jira Gesendet mit BlackBerry® Webmail von Telekom Deutschland