See my previous comments on the mailing list. I disagre with this behaviour.

The current behaviour reflects reality much better (I do not say this is 
ideal). Taking raw materials out and putting inexistent stock in at the 
confirmation of a production will result in incorrect accounts for both, raws 
and end products,

If we touch this, I suggest we check out inventory when work actually begins 
(this is NOT when the prodrun is confirmed, but rather when the first actual 
routing task is started) and allow to return a fraction of checked out 
inventory when a prod run is cancelled.
The end product should only be added to stock/inventory when the prod run is 
confirmed (allowing for example a QA function to confirm the Prod run and add 
only the fraction of end products that have passed QA.

Both, the check out of raw as well as the confirmation of end products work in 
OFBiz as described above. Thus this JIra record should focus at the inventory 
behaviour when production runs are cancelled.

Regards


Carsten


------Original Message------
From: Pierre Smits (JIRA)
To: [email protected]
ReplyTo: [email protected]
Subject: [jira] [Created] (OFBIZ-5296) AtP of products should be adjusted when 
production run is confirmed
Sent: Aug 20, 2013 14:09

Pierre Smits created OFBIZ-5296:
-----------------------------------

             Summary: AtP of products should be adjusted when production run is 
confirmed
                 Key: OFBIZ-5296
                 URL: https://issues.apache.org/jira/browse/OFBIZ-5296
             Project: OFBiz
          Issue Type: Improvement
          Components: manufacturing, product
    Affects Versions: SVN trunk
            Reporter: Pierre Smits


When a production run is confirmed we know what is intended to go in the 
production run (the components or ingredients aka the raw materials) and what 
is intended to go out (the finished product).

Unlike with an order, the AtP (Availability to Promise) of the goods involved 
does not get adjusted. 
The result is that requirements for PO or even the PO itself get generated to 
late (at the moment when QoH reaches minimum stock in stead of when AtP reaches 
minimum stock).

Following scenarios need to be resolved:
1. On confirmation of the production run (action = Confirm), the AtP of the 
product to be produced must increase and the AtP of materials needed must 
decrease.

2. When production is running and materials have been released to the 
production run, it is possible to return materials back to inventory. When 
doing so, the AtP of the materials must be adjusted accordingly with the same 
date-time and quantity as the returned materials.

3. When a production run has rejected end products the AtP of the end product 
must be adjusted with the same date-time and quantity as the declaration of the 
rejected product.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Gesendet mit BlackBerry® Webmail von Telekom Deutschland  

Reply via email to