[
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15468994#comment-15468994
]
prakul agarwal commented on PHOENIX-3181:
-----------------------------------------
Attaching a diff for executing test suite with method level parallelization. .
The integration-test phase completed in ~6 min (usually it takes ~20 min ) with
5 forks and threadCount = 5. ~20 tests are failing, whose related classes have
been commented out in the attached diff. I have also tinkered with various
settings in Phoenix configurations.
> Run test methods in parallel to reduce test suite run time
> ----------------------------------------------------------
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
> Issue Type: Bug
> Reporter: James Taylor
> Assignee: prakul agarwal
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel
> since the table names won't conflict. This should greatly reduce the time
> taken to run all of our tests.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)