[ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15468994#comment-15468994
 ] 

prakul agarwal commented on PHOENIX-3181:
-----------------------------------------

Attaching a diff for executing test suite with method level parallelization. . 
The integration-test phase completed in ~6 min (usually it takes ~20 min ) with 
5 forks and threadCount = 5. ~20 tests are failing, whose related classes have 
been commented out in the attached diff. I have also tinkered with various 
settings in Phoenix configurations.



> Run test methods in parallel to reduce test suite run time
> ----------------------------------------------------------
>
>                 Key: PHOENIX-3181
>                 URL: https://issues.apache.org/jira/browse/PHOENIX-3181
>             Project: Phoenix
>          Issue Type: Bug
>            Reporter: James Taylor
>            Assignee: prakul agarwal
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to