[ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15483322#comment-15483322
 ] 

Rajeshbabu Chintaguntla commented on PHOENIX-3181:
--------------------------------------------------

bq. can you think of a reason why this test would hang if the methods are run 
in parallel?
Now in the tests each test case is creating it's own tables so they should not 
be hanged. Can I get any logs/build or the way to reproduce it to check it.

> Run test methods in parallel to reduce test suite run time
> ----------------------------------------------------------
>
>                 Key: PHOENIX-3181
>                 URL: https://issues.apache.org/jira/browse/PHOENIX-3181
>             Project: Phoenix
>          Issue Type: Bug
>            Reporter: James Taylor
>            Assignee: prakul agarwal
>         Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, 
> parallelize_4.x-Hbase1.1_wip.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to