Current plan is to have a 4.9.0 RC in that same timeframe (by 10/31) with
the column encoding work (PHOENIX-1598 and PHOENIX-2565) and PHOENIX-6
(atomic insert/update).  If it's too much much for you to do both 4.8.2 and
4.9 simultaneously, I can volunteer to be the RM for 4.9.

On Sat, Oct 15, 2016 at 6:42 PM, <la...@apache.org> wrote:

> Hi All,
> we have 20 jiras against 4.8.2 some of which seem important enough ... and
> over 200 against 4.9.0.
> I think we should start keeping stable branches for longer.As before I'll
> volunteer doing 4.8.2 as well as a 4.9.0.
> Let's think about a 4.8.2 in two weeks or so, unless there're vastly
> different opinions.
>
> -- Lars
>

Reply via email to