Current plan is to have a 4.9.0 RC in that same timeframe (by 10/31) with the column encoding work (PHOENIX-1598 and PHOENIX-2565) and PHOENIX-6 (atomic insert/update). If it's too much much for you to do both 4.8.2 and 4.9 simultaneously, I can volunteer to be the RM for 4.9.
On Sat, Oct 15, 2016 at 6:42 PM, <[email protected]> wrote: > Hi All, > we have 20 jiras against 4.8.2 some of which seem important enough ... and > over 200 against 4.9.0. > I think we should start keeping stable branches for longer.As before I'll > volunteer doing 4.8.2 as well as a 4.9.0. > Let's think about a 4.8.2 in two weeks or so, unless there're vastly > different opinions. > > -- Lars >
