On Tuesday, 9 May 2017 at 16:14:57 UTC, Nemanja Boric wrote:
On Tuesday, 9 May 2017 at 04:35:40 UTC, Ali Çehreli wrote:
Please list what we've achieved during the hackathon,
including what is started but is likely to be finished in the
coming days or months.
For me:
- Finished updating "Programming in D" to 2.074.0 (the HTML is
now up to date but I could not get to the still manual work of
preparing the ebooks)
- Contributed to the logo and branding discussions
- Opened two bugs
- Ate German cookies :)
Ali
I've fixed the FreeBSD-Current exception handling issue, so
that exception handling is now working there as well (I also
suspect
that it was broken pretty much on all libundwind 64bit systems,
just worked by accident, since the optimizer didn't try too
hard.
It's something I wanted to do for a long time, but there's
never time,
so having a day dedicated to it was pretty helpful!
https://issues.dlang.org/show_bug.cgi?id=16856
It was pretty cool finding Jonathan who filed the bug in the
same room, then
chasing Walter to talk about it, after hearing all war stories,
including,
but not limited to, blue meteors.
Oh, also working with Martin and chasing him around the rooms to
get
my druntime PR for fiber stack overflow protection
(https://github.com/dlang/druntime/pull/1698)
merged after months and months is also worth mentioning, although
it didn't happen during the hackaton :-)