Like Jack, the complexity of the project dictates how the requirements are collected. Basically we do "other" and here is what we do: 1 UI person and designer get with biz owner to get high level requirements for purpose of design elements. At this point we may or may not include a Business Analyst. 2. Initial wireframes/mockups are done and once okay'd by owner, Business Analyst is incorporated and requirements for functionality collected. 3. Project Manager is not incorporated until there is a completed set of mock ups, HTML prototype and complete Biz Requirements doc version 1.0.
We are currently in discussed within our Interactive Design Dept (where my position as Usability Coorindator is) of having a project manager role added into the very early stages but this PM would not be the one that would be responsible for actually driving the final SDLC to production. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Posted from the new ixda.org http://www.ixda.org/discuss?post=41112 ________________________________________________________________ Welcome to the Interaction Design Association (IxDA)! To post to this list ....... [email protected] Unsubscribe ................ http://www.ixda.org/unsubscribe List Guidelines ............ http://www.ixda.org/guidelines List Help .................. http://www.ixda.org/help