By main door, do you mean the "inner" door (within the building, to our
suite)?



On Wed, Dec 12, 2012 at 3:50 PM, Colin Stanners <[email protected]> wrote:

> *someone removed the (black?) ethernet cable from the lounge switch
>   to the switch near the classroom, possibly while attaching the cables
>   to the roof - please DO NOT remove infrastructure like that! There`s
>   enough work to do already, I expect whoever did that to reinstall it
> ASAP.
>
> *if anyone has a spare 12V bell / buzzer I could use that for the doorbell.
>
> *should information like this go on announce@ as well?
>
>
> Internet Connection:
>
> We`re still getting internet from the dish at Adelaide until VOI has the
> time
> to donate/install service at Sksp2. I had setup a 5.4ghz link between both
> buildings to feed Sksp2 but that frequency can have issues - it`s a radar
> band and the radios are required to shut down for 1-30mins in the "rare"
> case
> that they detect radar (didn`t use 2.4ghz due to likely interference or
> 5.8ghz
> because VOI was using that at sksp1). Something along this radio path
> was constantly triggering the radar detect (buildings reflecting the
> airport
> radar? Police leaving theirs on as they drive around?) and shutting the
> link off.
> Tweaking it just made it a bit better or worse, so in the end I just
> changed the
> equipment to a 2.4ghz link, it`s slower (14mbit) but fixes the issues.
>
>
> Card Access:
>
> Thor, Adrian and I spent 13hrs combined (over the last 24hrs) to run 6
> cables
> through carved-out baseboards / metal doorframes / 100 years of dirt to the
> front door (4x cat5 for card access / indoor cam / outdoor cam / spare, 2x
> 18-
> guage pairs to power the strike even in cold weather and for the outside
> camera
> heater). This fixes the front door reliability issues; the door "beta" is
> almost
> finished, just need to make it pretty by putting the cables in channels and
> painting those channels the right colours.
>
> After that I`ll run a cable channel from the Sksp2 main door to the area
> above
> the bathrooms where the card access panel will be installed, carrying all
> the
> previously-mentioned cables and the cable for the sksp2 main door.
>
> For the cameras - AW is ready to donate some spare security cameras to us,
> but they don`t know how many that would be until the constructions is done
> (weeks?). The company for whom I do part-time camera/security installs has
> boxes of old cameras, I`ll arrange to get some of those tested and usable.
>
> I do not yet have a timeframe é final plan to make the main door
> manually-openable
> (other than paying a locksmith $500+), may have time during Christmas
> break.
>
> Let me know if anything else is needed.
> -C
>
> _______________________________________________
> SkullSpace Discuss Mailing List
> Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss
> Archive: https://groups.google.com/group/skullspace-discuss-archive/
>
_______________________________________________
SkullSpace Discuss Mailing List
Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss
Archive: https://groups.google.com/group/skullspace-discuss-archive/

Reply via email to