By main door, he means the suite door. So there would be a run of cable
from the suite door to above the bathroom area.

Colin, if you need help over the holidays, let me know. If we plan a day
for this I could match the paint and cover that, if necessary.

Merci pour votre contribution


On 12 December 2012 16:01, Roswyne <[email protected]> wrote:

> By main door, do you mean the "inner" door (within the building, to our
> suite)?
>
>
>
> On Wed, Dec 12, 2012 at 3:50 PM, Colin Stanners <[email protected]>wrote:
>
>> *someone removed the (black?) ethernet cable from the lounge switch
>>   to the switch near the classroom, possibly while attaching the cables
>>   to the roof - please DO NOT remove infrastructure like that! There`s
>>   enough work to do already, I expect whoever did that to reinstall it
>> ASAP.
>>
>> *if anyone has a spare 12V bell / buzzer I could use that for the
>> doorbell.
>>
>> *should information like this go on announce@ as well?
>>
>>
>> Internet Connection:
>>
>> We`re still getting internet from the dish at Adelaide until VOI has the
>> time
>> to donate/install service at Sksp2. I had setup a 5.4ghz link between both
>> buildings to feed Sksp2 but that frequency can have issues - it`s a radar
>> band and the radios are required to shut down for 1-30mins in the "rare"
>> case
>> that they detect radar (didn`t use 2.4ghz due to likely interference or
>> 5.8ghz
>> because VOI was using that at sksp1). Something along this radio path
>> was constantly triggering the radar detect (buildings reflecting the
>> airport
>> radar? Police leaving theirs on as they drive around?) and shutting the
>> link off.
>> Tweaking it just made it a bit better or worse, so in the end I just
>> changed the
>> equipment to a 2.4ghz link, it`s slower (14mbit) but fixes the issues.
>>
>>
>> Card Access:
>>
>> Thor, Adrian and I spent 13hrs combined (over the last 24hrs) to run 6
>> cables
>> through carved-out baseboards / metal doorframes / 100 years of dirt to
>> the
>> front door (4x cat5 for card access / indoor cam / outdoor cam / spare,
>> 2x 18-
>> guage pairs to power the strike even in cold weather and for the outside
>> camera
>> heater). This fixes the front door reliability issues; the door "beta" is
>> almost
>> finished, just need to make it pretty by putting the cables in channels
>> and
>> painting those channels the right colours.
>>
>> After that I`ll run a cable channel from the Sksp2 main door to the area
>> above
>> the bathrooms where the card access panel will be installed, carrying all
>> the
>> previously-mentioned cables and the cable for the sksp2 main door.
>>
>> For the cameras - AW is ready to donate some spare security cameras to us,
>> but they don`t know how many that would be until the constructions is
>> done
>> (weeks?). The company for whom I do part-time camera/security installs has
>> boxes of old cameras, I`ll arrange to get some of those tested and usable.
>>
>> I do not yet have a timeframe é final plan to make the main door
>> manually-openable
>> (other than paying a locksmith $500+), may have time during Christmas
>> break.
>>
>> Let me know if anything else is needed.
>> -C
>>
>> _______________________________________________
>> SkullSpace Discuss Mailing List
>> Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss
>> Archive: https://groups.google.com/group/skullspace-discuss-archive/
>>
>
>
> _______________________________________________
> SkullSpace Discuss Mailing List
> Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss
> Archive: https://groups.google.com/group/skullspace-discuss-archive/
>
_______________________________________________
SkullSpace Discuss Mailing List
Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss
Archive: https://groups.google.com/group/skullspace-discuss-archive/

Reply via email to