By main door, he means the suite door. So there would be a run of cable from the suite door to above the bathroom area.
Colin, if you need help over the holidays, let me know. If we plan a day for this I could match the paint and cover that, if necessary. Merci pour votre contribution On 12 December 2012 16:01, Roswyne <[email protected]> wrote: > By main door, do you mean the "inner" door (within the building, to our > suite)? > > > > On Wed, Dec 12, 2012 at 3:50 PM, Colin Stanners <[email protected]>wrote: > >> *someone removed the (black?) ethernet cable from the lounge switch >> to the switch near the classroom, possibly while attaching the cables >> to the roof - please DO NOT remove infrastructure like that! There`s >> enough work to do already, I expect whoever did that to reinstall it >> ASAP. >> >> *if anyone has a spare 12V bell / buzzer I could use that for the >> doorbell. >> >> *should information like this go on announce@ as well? >> >> >> Internet Connection: >> >> We`re still getting internet from the dish at Adelaide until VOI has the >> time >> to donate/install service at Sksp2. I had setup a 5.4ghz link between both >> buildings to feed Sksp2 but that frequency can have issues - it`s a radar >> band and the radios are required to shut down for 1-30mins in the "rare" >> case >> that they detect radar (didn`t use 2.4ghz due to likely interference or >> 5.8ghz >> because VOI was using that at sksp1). Something along this radio path >> was constantly triggering the radar detect (buildings reflecting the >> airport >> radar? Police leaving theirs on as they drive around?) and shutting the >> link off. >> Tweaking it just made it a bit better or worse, so in the end I just >> changed the >> equipment to a 2.4ghz link, it`s slower (14mbit) but fixes the issues. >> >> >> Card Access: >> >> Thor, Adrian and I spent 13hrs combined (over the last 24hrs) to run 6 >> cables >> through carved-out baseboards / metal doorframes / 100 years of dirt to >> the >> front door (4x cat5 for card access / indoor cam / outdoor cam / spare, >> 2x 18- >> guage pairs to power the strike even in cold weather and for the outside >> camera >> heater). This fixes the front door reliability issues; the door "beta" is >> almost >> finished, just need to make it pretty by putting the cables in channels >> and >> painting those channels the right colours. >> >> After that I`ll run a cable channel from the Sksp2 main door to the area >> above >> the bathrooms where the card access panel will be installed, carrying all >> the >> previously-mentioned cables and the cable for the sksp2 main door. >> >> For the cameras - AW is ready to donate some spare security cameras to us, >> but they don`t know how many that would be until the constructions is >> done >> (weeks?). The company for whom I do part-time camera/security installs has >> boxes of old cameras, I`ll arrange to get some of those tested and usable. >> >> I do not yet have a timeframe é final plan to make the main door >> manually-openable >> (other than paying a locksmith $500+), may have time during Christmas >> break. >> >> Let me know if anything else is needed. >> -C >> >> _______________________________________________ >> SkullSpace Discuss Mailing List >> Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss >> Archive: https://groups.google.com/group/skullspace-discuss-archive/ >> > > > _______________________________________________ > SkullSpace Discuss Mailing List > Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss > Archive: https://groups.google.com/group/skullspace-discuss-archive/ >
_______________________________________________ SkullSpace Discuss Mailing List Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss Archive: https://groups.google.com/group/skullspace-discuss-archive/