Thanks for all your work on this Colin. You have gone above and beyond. On May 19, 2013 11:24 AM, "Colin Stanners" <[email protected]> wrote:
> If anyone (Zewwy / Kenny / Adrian?) has time to help me with wiring this > week, let me know. > > > Wiring > ----------- > Done: 6x wires from above-bathrooms to downstairs door > Done: 5x wires from server rack to above-bathrooms > Done: 3x wires from above-bathroom to end of classroom > Almost done: 6x from server rack to roof - need to tension guy lines > better, trim zipties. > Todo: 3x wires from server rack to lounge switch, main wifiAP on > lounge ceiling, and VGAoCAT5 for projector > Todo: 2x wires from server rack to workbench and middle table area > > Server area needs more wire clean-up, wires patched down to panel and > labeled. > To be done correctly, in some places (horizontal runs) cabling needs to be > held by metal, not plastic. > Later I'll put together a shopping list and plans to get old runs > corrected. > > Doorbell > ------------ > Todo: Need to setup relay so the bell will ring when the card access > system's power is disconnected. > > > Touchscreens > ------------ > Thor, Jeremy and Mark are working on getting the correct serial > touchscreen driver. After that we > can set them up inside/outside the space as terminals for calendar etc. > > > Cameras > ------------- > Installed 9: N+S rear parking lot; back door; elevator; outside Sksp2 > door; outside front door; > inside front door; N part of front street; roof view incl. internet antenna > > They're accessible from http://IP.skullspace.ca:81 > > I bought a 1x4 VGA splitter from Monoprice and eBay VGAoverCAT5 adapters* > so that the view from the security PC can be sent to the currently-unused > second VGA inputs on the projectors. Still waiting for the adapters. > > > Documentation > ------------- > I need to label wires; also update the networking wiki page, but my login > for the wiki is on a laptop 3ft > away from me right now (didn't install VNC server on it) and getting there > is work. > > > Projectors > ----------- > Sksp lounge: I'm getting the same MP stand so it can be roof-mounted too. > > Classroom: need to install wire guide to make VGA run nicer. > > Both of these will have a line from the VGA splitter delivered over cat5. > > > Main Sksp2 door > ----------- > Doesn't always shut automatically as the frame is tight - I think it just > needs a bit of wedging apart in some places > > > Network upgrades > ---------- > We've had the hardware to upgrade the 10x4mbit backup AW link to > 100x100mbit > since the beginning but it's quite a few hours to setup/configure/install, > low priority. > > High-end HP 2.4+5.xGhz wifi AP was donated by Nate (now is the > "skullspace" SSID), need to find/print a mount for the ceiling. > > Should setup a PC (Zewwy's?) running MRTG to log traffic statistics on all > switch ports, > maybe even local temperature and network rack power usage (measured at > UPSes). > > Will soon get a new sksp main internal router (Mikrotik RouterBoard 450G) > and change the 192.168.1.x net > to below. This'll allow VPNing in, separate networks, redundant uplinks, > QOS, also IPv6. > 172.30.4.x = testing/reserved for later use (you may notice all of > these are within a /22) > 172.30.5.x = Security/Management network router .1 hosts .10-.29 > DHCP .100-.250 > 172.30.6.x = Main network DHCP .100-.250 router .1 network gear > .10-.39 printers .40-.49 VMs, servers .50-.79 > 172.30.7.x = CTF Network DHCP .100-.250 router .1 > > > Internal web page > ------------- > The one I did for AW with links to all device web interfaces is useful, > will make one for Sksp after re-ip. > > > Card access control > ----------- > VM is working well, some final tests and fixes to do before remote access > is complete. > > > Skullspace door: allowing landlord access and easy exit > --------- > I got a motion detector from eBay to allow auto-unlocking when > people get close to the door inside, but in the process of converting its > relay > from connecting the positive terminal to connecting the negative terminal > I seem to have broken something since now it won't un-detect after boot. > Got a different one that I'll try to setup. > > Door access for landlord/staff without keyfob: may be possible to move the > current deadbolt to the "main" doorknob to make it work, but this is > far on my to-do list right now, or $500 to get done by a locksmith. > This would also allow exit without needing to push a button - preferable. > > Another option people mentioned would be a keypad at the door - this is > easy > and cheap to do but I'd rather have the standard key option. > > > UPSes > ------------- > Square 600VA unit has a dying battery, will move the machines (Mak's and > Ayecee's IIRC) off it. > Nate's huge unit (always funny saying that) reports a battery error, I'll > check wiring. > > > Hooking access control to fire alarm for auto-release: > ------------- > Should be easily doable, I need to check what is required. > > _______________________________________________ > SkullSpace Discuss Mailing List > Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss > Archive: https://groups.google.com/group/skullspace-discuss-archive/ >
_______________________________________________ SkullSpace Discuss Mailing List Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss Archive: https://groups.google.com/group/skullspace-discuss-archive/
