Hi All.
This post is for those in Australia with H36 Aircraft.
For those who have the FRP fuel tank which needs inspection every annual or 
100hours note it expires at 3000 hours.
I have a copy of the drawings for the alloy replacement fuel tank.
This will require and OZ E.O. being raised for the production of the same and 
welded by a CASA certified welder.
I have spent some time tracing over the drawings as they are old blue prints 
and working through the interpretation with German speaking engineers to get 
then to the point of being able to be used here.
There are some tooling issues which will need to be addressed in an EO for an 
alternative to the fabrication method on the drawings.
Thus before Rob and I go down this this path to produce 2 tanks is there anyone 
else on the list interested in cost sharing for an upgrade.
I will happily do the change just to avoid the AD each year.

Also I have had a quote from Diamond. To put things in perspective the quote is 
less than a new set of clear view panels and rails for the canopy.
If there are enough interested I can negotiate a better price. Being realistic 
with the way the exchange rate is the price isn’t bad and if we can get a 
discount for volume it will be even better.

>From Diamond.
“P/N for the tank is DV2-2811-00-00, sales price € 635,18 for one piece
We do not have them on stock. If you are going to order them the external 
supplier has to produce them new for you.”

Cheers.
Nige.

Reply via email to