Hi All,

 

In working thru the paperwork for a hopeful New Zealand C of A for the
rocket (Dimona S/no 3537)   I have come up with this Slick AD which clearly
says 250hrs or 24 mths whatever is the soonest.

 

Has that changed ??  it does seem 24 Mths is rather fierce.  Especially with
a Dimona because access around the back of the engine is not ideal.  I can
live with the 250hrs (normally 500 with a dual mag installation) but 24
Mths!!      !@#$.

 

Also do any of you have any design or ideas for a trolley so the aircraft
can be pulled out of a hangar sideways ??

 

 

Thanks

 

Ian Williams

ZK-GCB  

Reply via email to