I'm just finishing my KAT100 build to use with K2/100 SN #7230.
I did not build the K2 and have never built one - so unfamiliar territory.

The instructions say to pull the control board and KAF2 if present.
It also says to use the "long handled Allen wrench" - yea I don't have
that .  This K2 has a KDSP2 installed.  I need to cut the trace and install
R12 between R8 and R9.  

I popped the top panel between the front panel and the KPA100 and can
see the board and the resistors.  This K2 has a jumper placed where the
R12 needs to go.  Before I start pulling stuff apart can someone give me
a bit of a clue how to pull this board?  I don't want to break an excellent
working radio.  If Don is reading this - it's the one you fixed for me.
I don't want to have to send it to you again.

"Dammit Jim I'm just an old country doctor!"

Thanks for any help you can be.

73
Stan AE7UT




--
View this message in context: 
http://elecraft.365791.n2.nabble.com/KAT100-project-removing-the-control-board-tp7573412.html
Sent from the Elecraft mailing list archive at Nabble.com.
______________________________________________________________
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:[email protected]

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html

Reply via email to