I read in !emc-pstc that [email protected] wrote (in <88256AAB.00
[email protected]>) about 'Manufacturing Hipot Testing', on
Fri, 17 Aug 2001:
>A Hipot standard which we must run for CE compliance requires that
>circuit-to-circuit and circuit-to-ground testing be performed on a routine
>basis. 

You don't tell us which standard you are applying. You may have
misinterpreted it, but we can't tell. 

The 'routine' production-line 100% test is NOT intended to be a time-
consuming process. The people who wrote the test procedure (which did
not include me) do have *just a little* experience of volume production.
-- 
Regards, John Woodgate, OOO - Own Opinions Only. http://www.jmwa.demon.co.uk 
Eat mink and be dreary!

-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

Visit our web site at:  http://www.ewh.ieee.org/soc/emcs/pstc/

To cancel your subscription, send mail to:
     [email protected]
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Michael Garretson:        [email protected]
     Dave Heald                [email protected]

For policy questions, send mail to:
     Richard Nute:           [email protected]
     Jim Bacher:             [email protected]

All emc-pstc postings are archived and searchable on the web at:
    http://www.rcic.com/      click on "Virtual Conference Hall,"


Reply via email to