Regarding Jon's last comments about the use of un-calibrated equipment.

CDS has an internal Metrology department which handles almost all of my
periodic calibration (I send out my antennas, current probes & LISN's).
Every year, we have a long discussion about their need to minimize
calibration costs. (I have to provide them with a budget to cover all of my
predicted calibration costs.)

One thing I have done to minimize costs is to put all of my power supplies,
amplifiers, pulse generators and function generators on a "No Periodic
Calibration; User Verified" status. My rationale is that I never trusted
these devices to actually create what you set them for, so I always use a
calibrated DMM or oscilloscope to verify and monitor any settings. (All of
this NPC equipment carries a bright label warning of its status.)

Of course, I still keep all oscilloscopes, meters, spectrum analyzers,
measurement pre-amps, attenuators and probes on normal periodic calibration.
I also keep any signal sweepers, signal generators and AF/RF synthesizers
also on calibration, since I like to be able to use them "stand-alone" for
some testing. Also, having calibrated RF signal sources allows me to
informally cross-check my meters and analyzers.

Using this system, I have moved from 100% calibrated equipment to only about
30% calibrated equipment. Considering that I have about 300 capital
equipment items, this has resulted in a pretty decent cost reduction in the
past few years.

Regards,

Ed

Ed  Price
[email protected]
Electromagnetic Compatibility Lab
Cubic Defense Systems
San Diego, CA.  USA
858-505-2780 (Voice)
858-505-1583 (Fax)
Military & Avionics EMC Services Is Our Specialty
Shake-Bake-Shock - Metrology - Reliability Analysis


-----Original Message-----
From: Jon D. Curtis [mailto:[email protected]]
Sent: Monday, February 26, 2001 10:48 AM
To: Flinders, Randall
Cc: [email protected]; [email protected];
[email protected]; [email protected]
Subject: Re: Calibration of test equipment



As I understand it the interpretation to have tracibility to your national
authority through equipment used only for calibration originated with NAMAS.
Some other accreditors have picked it up since then.

The requirement need not be that onerous.  You can calibrate your own
equipment
traceably to your national authority using equipment that you send out for
calibration.  Where the instrument is cheap (multimeter) we buy an extra and
use it only for calibration.  Where it is expensive (oscope, receiver), we
use
it for calibration only directly after it returns from outside calibration
(or
inside tracible cal) and after we have calibrated our secondary equipment
with
it we put it into regular service for the year.  If you manage your yearly
calibration cycle well this shouldn't crimp your style too much.

The key is not to have equipment in your calibration chain back to the
national
authority that has been used for non-calibration purposes between the time
of
its calibration and that of the secondary calibration.

The idea is to have high confidence that the tracibilty chain is intact.  If
a
piece of equipment in the chain has been used daily in regular rough and
tumble
testing it is seen as having a much higher probability of operating outside
of
its tolerances.  In my experience the outside cal houses are pretty tough on
their gear too, so I am not sure that much is gained.

I personally think this interpretation is overly severe, but we comply with
it
because we want our test reports to be accepted by authorities who think
this
process is reasonable.

To directly answer your specific question about a signal generator used in
immunity:  If it is being used as an uncalibrated signal source in the
measurement and you are using a power meter or receiver for tracibility then
you can use that signal generator, even if it went off a cliff the day
before.
If you are relying on the calibrated output level that the signal generator
says it is putting out, then you should not have used that instrument in
non-calibration use since its last calibration.

Jon.

"Flinders, Randall" wrote:

> Does this mean that a signal generator that is used for Radiated
> Immunity testing should not be used to calibrate Pre-Amps and Cables?
> How about Antenna Calibration?  Can you use the same receiver you use on
> the OATS to calibrate those?  I know this is a common practice with
> Commercial Test Labs.
>
> Is there guidance as to what types of equipment can be used for both lab
> use and for the calibration of other equipment?
>
> [email protected] wrote:
> >
> > I think there is a special requirement to keep the calibration equipment
> > separate from the EMC equipment. In other words the calibration
equipment
> > can only be used for the calibration process and not for testing EMC.
> >
> > > Michael Sundstrom
> > > Product Test Technician EMC
> > > Nokia Mobile Phones, Dallas PCC
> > >
> > > *   Email   [email protected]
> > > %  Desk  (972) 374-1462
> > > *Mobile  (817) 917-5021
> > > * Fax  (972) 374-0901
> >         amateur call:  KB5UKT
> >
> > -------------------------------------------
> > This message is from the IEEE EMC Society Product Safety
> > Technical Committee emc-pstc discussion list.
> >
> > Visit our web site at:  http://www.ewh.ieee.org/soc/emcs/pstc/
> >
> > To cancel your subscription, send mail to:
> >      [email protected]
> > with the single line:
> >      unsubscribe emc-pstc
> >
> > For help, send mail to the list administrators:
> >      Michael Garretson:        [email protected]
> >      Dave Heald                [email protected]
> >
> > For policy questions, send mail to:
> >      Richard Nute:           [email protected]
> >      Jim Bacher:             [email protected]
> >
> > All emc-pstc postings are archived and searchable on the web at:
> >     http://www.rcic.com/      click on "Virtual Conference Hall,"
>
> -------------------------------------------
> This message is from the IEEE EMC Society Product Safety
> Technical Committee emc-pstc discussion list.
>
> Visit our web site at:  http://www.ewh.ieee.org/soc/emcs/pstc/
>
> To cancel your subscription, send mail to:
>      [email protected]
> with the single line:
>      unsubscribe emc-pstc
>
> For help, send mail to the list administrators:
>      Michael Garretson:        [email protected]
>      Dave Heald                [email protected]
>
> For policy questions, send mail to:
>      Richard Nute:           [email protected]
>      Jim Bacher:             [email protected]
>
> All emc-pstc postings are archived and searchable on the web at:
>     http://www.rcic.com/      click on "Virtual Conference Hall,"

--
Jon D. Curtis, P.E.

Director of Engineering
Curtis-Straus LLC

One Stop Laboratory for NEBS, EMC,
Product Safety, and Telecom Testing.
527 Great Road
Littleton, MA 01460 USA
Voice 978-486-8880  Fax 978-486-8828
email: [email protected]
WWW.CURTIS-STRAUS.COM



-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

Visit our web site at:  http://www.ewh.ieee.org/soc/emcs/pstc/

To cancel your subscription, send mail to:
     [email protected]
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Michael Garretson:        [email protected]
     Dave Heald                [email protected]

For policy questions, send mail to:
     Richard Nute:           [email protected]
     Jim Bacher:             [email protected]

All emc-pstc postings are archived and searchable on the web at:
    http://www.rcic.com/      click on "Virtual Conference Hall,"

-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

Visit our web site at:  http://www.ewh.ieee.org/soc/emcs/pstc/

To cancel your subscription, send mail to:
     [email protected]
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Michael Garretson:        [email protected]
     Dave Heald                [email protected]

For policy questions, send mail to:
     Richard Nute:           [email protected]
     Jim Bacher:             [email protected]

All emc-pstc postings are archived and searchable on the web at:
    http://www.rcic.com/      click on "Virtual Conference Hall,"

Reply via email to