I seem to have hit a raw nerve by suggesting that emc test equipment should be NAMAS calibrated. But surely some cost for calibration should come into the equation. Surely no professional test engineer would use test equipment that had not been calibrated at least annually!!!
Brian Harlowe Thermo V.G. Scientific Tel +44 (0)1342 327211 Fax +44 (0)1342 315074 ------------------------------------------- This message is from the IEEE EMC Society Product Safety Technical Committee emc-pstc discussion list. Visit our web site at: http://www.ewh.ieee.org/soc/emcs/pstc/ To cancel your subscription, send mail to: [email protected] with the single line: unsubscribe emc-pstc For help, send mail to the list administrators: Michael Garretson: [email protected] Dave Heald [email protected] For policy questions, send mail to: Richard Nute: [email protected] Jim Bacher: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.rcic.com/ click on "Virtual Conference Hall,"

