Richard,
  I've been out of the NEBS arena for about 2 years - but since section 5.1.1
is "transportation and storage test methods", I would say item #3.  Here's my
reasoning:

1) The items should be packaged during test if possible (see 5.1.1)
2) The test simulates conditions in unconditioned spaces such as trucks.
3) Unloading from the truck would take time, as would receiving the unit and
getting it to the install area.  This should allow for the unit to stabilize
or at least get back into the optemp range.
4) Unpacking and installation would cover the rest - by the time a shelf is
installed and wired properly it should have finished temp stabilization.

As for pass/fail...I'm pretty sure this is a survivability test.  Since this
is simulating initial installation & startup and the unit is not yet in
service, I would ask what is normal...if the unit typically must go through an
initial sequence to set itself up, then fine.  If something out of the
ordinary happened but it recovers, probably fine (but not my call).

That's my 2 cents...

Best Regards,
-Dave Heald


David Heald
EMC Engineer / Worldwide Regulatory
Symbol Technologies
tel: +1.631.738.5373
fax: +1.631.738.3915

Symbol.  The Enterprise Mobility Company. (TM)




>>> "Georgerian, Richard" <[email protected]> 03/28/05 11:29AM >>>
Greetings All,

In the NEB Requirements: Physical Protection standard GR-63, sections
5.1.1.1 and 5.1.1.2, they both have the statement-
        "Perform post-test equipment's functionality test after the
equipment has stabilized at ambient temperature."

This is after the unit has been soaked in -40 degrees C or +70 degrees C for
72 hours in an environmental chamber. The unit is then removed from the
chamber and into room ambient or the chamber ambient is increased to room
ambient temperature in less than 5 minutes. In determining the units
functionality, what is meant by the above statement? Is it to-
1) Turn the unit on immediately after removal from the chamber and observe
what happens.
2) Turn the unit on immediately after removal from the chamber, wait until
the unit has completed its power on sequence, then start to evaluate the
unit's functionality. The power on sequence may take several minutes as
components are warming up and may not start operating until they have
reached a higher operating temperature..
3) Wait until the unit's components has reached room ambient temperature,
before powering on the unit. This may take more than several minutes before
powering on the unit.

As for pass or fail, if the unit does not function normally even when the
unit has reached room ambient, it then fails. However, if it takes several
minutes and goes through several resets, before finally functioning
normally, is that a failure?

Thanks to all in advance.

Richard
=====
Richard Georgerian
Compliance Engineer
Carrier Access Corporation
5395 Pearl Parkway
Boulder, CO 80301
USA

Tele: 303-218-5748      Fax: 303-218-5503
mailto:[email protected]








This message is from the IEEE Product Safety Engineering Society
emc-pstc discussion list.    Website:  http://www.ieee-pses.org/

To post a message to the list, send your e-mail to [email protected]

Instructions:  http://listserv.ieee.org/listserv/request/user-guide.html

List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:

     Scott Douglas             [email protected]
     Mike Cantwell            [email protected]

For policy questions, send mail to:

     Richard Nute:           [email protected]
     Jim Bacher:             [email protected]

All emc-pstc postings are archived and searchable on the web at:

    http://www.ieeecommunities.org/emc-pstc


________________________________________________________________________
This email has been scanned for computer viruses.


________________________________________________________________________
This email has been scanned for computer viruses.


This message is from the IEEE Product Safety Engineering Society
emc-pstc discussion list.    Website:  http://www.ieee-pses.org/

To post a message to the list, send your e-mail to [email protected]

Instructions:  http://listserv.ieee.org/listserv/request/user-guide.html

List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:

     Scott Douglas             [email protected]
     Mike Cantwell            [email protected]

For policy questions, send mail to:

     Richard Nute:           [email protected]
     Jim Bacher:             [email protected]

All emc-pstc postings are archived and searchable on the web at:

    http://www.ieeecommunities.org/emc-pstc

Reply via email to