Greetings All, 

In the NEB Requirements: Physical Protection standard GR-63, sections 5.1.1.1
and 5.1.1.2, they both have the statement-

        "Perform post-test equipment's functionality test after the equipment
has stabilized at ambient temperature." 

This is after the unit has been soaked in -40 degrees C or +70 degrees C for
72 hours in an environmental chamber. The unit is then removed from the
chamber and into room ambient or the chamber ambient is increased to room
ambient temperature in less than 5 minutes. In determining the units
functionality, what is meant by the above statement? Is it to-

1) Turn the unit on immediately after removal from the chamber and observe
what happens. 
2) Turn the unit on immediately after removal from the chamber, wait until the
unit has completed its power on sequence, then start to evaluate the unit's
functionality. The power on sequence may take several minutes as components
are warming up and may not start operating until they have reached a higher
operating temperature..

3) Wait until the unit's components has reached room ambient temperature,
before powering on the unit. This may take more than several minutes before
powering on the unit.

As for pass or fail, if the unit does not function normally even when the unit
has reached room ambient, it then fails. However, if it takes several minutes
and goes through several resets, before finally functioning normally, is that
a failure?

Thanks to all in advance. 

Richard 
===== 
Richard Georgerian 
Compliance Engineer 
Carrier Access Corporation 
5395 Pearl Parkway 
Boulder, CO 80301 
USA 

Tele: 303-218-5748      Fax: 303-218-5503              
mailto:[email protected] 






---------------------------------------------------------------- This message
is from the IEEE Product Safety Engineering Society emc-pstc discussion list.
Website: http://www.ieee-pses.org/ 

To post a message to the list, send your e-mail to [email protected] 


Instructions: http://listserv.ieee.org/listserv/request/user-guide.html 


List rules: http://www.ieee-pses.org/listrules.html 


For help, send mail to the list administrators: 


Scott Douglas [email protected] Mike Cantwell [email protected] 


For policy questions, send mail to: 


Richard Nute: [email protected] Jim Bacher: [email protected] 


All emc-pstc postings are archived and searchable on the web at: 


http://www.ieeecommunities.org/emc-pstc


Reply via email to