Thanks everyone. It seems I am interpreting it correctly, and some other mfr's and "competent" bodies are not. None of us is perfect, but careful reading does give you the correct answer in this case so it's a bit frustrating.
Jim Eichner, P.Eng. Manager - Compliance Engineering and SW Test Xantrex Technology Inc. phone: (604) 422-2546 fax: (604) 420-1591 e-mail: [email protected] web: www.xantrex.com Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. From: [email protected] Sent: Tuesday, March 20, 2007 5:07 PM To: [email protected] Subject: IP testing per EN60529 This has to do with the IP 3X, and 4X ratings and tests. The testing is by way of 2.5mm rod or 1.0mm wire probes, which seems quite straight forward at first. But the probes are not meant to be used the way I'm used to. It's not about whether they can touch anything, it's about whether they can enter at all. This is pretty clear in the text and tables giving pass pass/fail criteria, and is made really obvious if you read the note under 13.3. That note says that for IP3X and 4X the requirements are meant to prevent spherical objects of 2.5mm or 1.0mm diameter that are capable of motion from entering the enclosure. So basically an "indirect or tortuous entry path" doesn't do the job and you have to limit the size of an opening somewhere along the path to less than the diameter of the probe. It's easy to get misled on that point, for a variety of reasons: - the probes have a defined length and a "stop", neither of which comes into play with the "shall not enter" criteria, but their presence suggest the more typical "ok to enter but not to touch hazardous parts" criteria - some of the examples in Annex A can easily be misinterpreted - safety compliance people are used to criteria that allows the probe to enter but not touch things - the standard touches on pass/fail in several places and the additional letters and first numeral have requirements that overlap but are different I have seen products on the market and results from certification bodies that make it clear this is being misinterpreted. People are assuming it's ok for the probe to enter as long as adequate clearance is maintained to live parts, whirling blades, etc, when in fact it is not acceptable for the IP3X and 4X probes to enter the enclosure. So given what I am seeing as widespread mis-interpretation my question is, am I wrong? Are the labs and other products on the market right, and I'm misinterpreting the requirements? Thanks, Jim Eichner, P.Eng. Manager - Compliance Engineering Xantrex Technology Inc. e-mail: [email protected] web: www.xantrex.com Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. Website: http://www.ieee-pses.org/ To post a message to the list, send your e-mail to [email protected] Instructions: http://listserv.ieee.org/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Scott Douglas [email protected] Mike Cantwell [email protected] For policy questions, send mail to: Jim Bacher: [email protected] David Heald: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. Website: http://www.ieee-pses.org/ To post a message to the list, send your e-mail to [email protected] Instructions: http://listserv.ieee.org/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Scott Douglas [email protected] Mike Cantwell [email protected] For policy questions, send mail to: Jim Bacher: [email protected] David Heald: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc ______________________________________________________________________ This email has been scanned by the MessageLabs Email Security System. For more information please visit http://www.messagelabs.com/email ______________________________________________________________________

