Henri,
We can try a test migration for the structure you mention. I don't think we
need log4j-attic; it can just be archived. Also, we want to change
logging-log4j-sandbox to logging-sandbox. It is going to be a repository
that is used by all of the subprojects for experimental stuff. We may need
to rearrange its contents.
How will checkin emails/notifications work? Is it possible to get
subproject checkins sent to the subproject dev mailing list or will there be
one email list that gets all checkin notifications?
thanks,
-Mark
----- Original Message -----
From: "Henri Yandell" <[EMAIL PROTECTED]>
To: "Mark Womack" <[EMAIL PROTECTED]>
Cc: "Logging General" <[email protected]>
Sent: Sunday, September 04, 2005 7:43 PM
Subject: Re: Logging-Log4j -> SVN
On Sun, 4 Sep 2005, Mark Womack wrote:
Hi Henri,
We are planning to migrate all of the Logging Services projects to svn.
We'd like to target the timeframe of 9/10 for the project-wide migration.
Is that timeframe ok with you?
(Presuming you mean next weekend) Should be doable. 20:00 onwards (US
Eastern).
We should go ahead and do a test migration as soon as you decide the
structure.
What are the things we need to decide as part of the migration?
Mainly where each one of the following should goto:
logging-chainsaw
logging-core
logging-log4cxx
logging-log4j
logging-log4j-sandbox
logging-log4net
logging-log4php
logging-site
Obvious one (as mentioned previously) is:
logging
<subproject>
trunk
branches
tags
site
It's common to not bother with branches/tags for the site. That leaves
log4j-sandbox and log4j-attic as malcontents to figure out. Is log4j-attic
wanted at all? It's not writeable currently, so might be something to
archive.
For the migration I think we should just treat them as subprojects and let
you guys handle any moves later on. What do you think?
One thing I was wondering in regards to the sandbox, should we have a
sandbox per project or maybe a top level sandbox that more people can
play in .
As a fellow umbrella chair, I'm increasingly in favour of a sandbox for
the whole TLP. That way it's much easier for the PMC to manage and isn't
left to each individual subproject.
Hen