Peter Alfredsen <[email protected]> wrote:
> I think we should start
> deprecating EAPI=0 usage *now* with a repoman warning whenever a new
> ebuild is committed that does not use EAPI=1 or EAPI=2. This warning
> should encourage use of the newest EAPI, EAPI=2.

A general question, that just popped into my head when i was reading
this: if i touch a ebuild which has EAPI=0, should i bump it to EAPI=2?
Since the introduction of EAPI i have been bumping EAPI of my ebuilds
based on need. So if i needed slot-deps, i've made the ebuild EAPI=1,
not EAPI=2 by choice. If i needed use-deps, then well, i went for
EAPI=2.

How are other ebuild developers doing this? What's the package manager
ppls take on this?
-- 
Regards, Matti Bickel
Signed/Encrypted email preferred (key 4849EC6C)

Attachment: pgpr5TMoF3mbY.pgp
Description: PGP signature

Reply via email to