Hi,
>I have a friend who is a civil engineer, and works in traffic planning.
>He'll tell you that you never plan a system around the expected peak
>requirements.  That condition should be considered an abberation, and poor

Another civil engineer will add that it is definitely true:-). In every aspect
of engineering. You can't even tell what's the peak value. You can just tell
the peak value that happened in the last 100-200 years (in water management),
and then you can evaluate with the cost/benefit ratio. But this is kind of far
from CS:-).

Ferenc

**********************************************************
To unsubscribe from this list, send mail to
[EMAIL PROTECTED] with the following text in the
*body* (*not* the subject line) of the letter:
unsubscribe gnhlug
**********************************************************

Reply via email to