Hello all,

I'm really wanting to use Realms more, but they are an uphill struggle
at the moment.

The first problem is having to manually set the realm of all ticklers
within a project. Surely they should all copy the realm of the Project
it's self (even if the project realm gets changed .. they should all
change to). It would be fine to go in and change individual ticklers
to a different realm if anyone wants that, but setting them all to the
same as the project is surely the most default required behaviour.

My second problem (and from people's previous responses, I assume it's
very difficult to do) would be a nice way of changing the realm of an
entire project (and all it's ticklers). In an idea world, I'd love
something like the projects dashboard, but rather than changing
Projects from Active to S/M, you could select the realm for that
project.

Can either of these things be done or should I stop hoping and just
try to use an alternate system to the ideal modification I have in my
head?

Cheers
Damian
--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups "GTD 
TiddlyWiki" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
For more options, visit this group at 
http://groups.google.com/group/GTD-TiddlyWiki?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to