On 6/27/06, Clinton N. Fell <[EMAIL PROTECTED]> wrote:
Hey, A small substation typically has 5000 KVA
(effectively 5MW)  which would give 1.4 FT/sec but would cause a large
enough disturbance that the power company would probably cut it off in a
few minutes.  A large substation (typical in European urban areas) would
be around 20MW and would give around 6FT/sec.


Isn't that (5000 / 360) = 14FT/sec and (20000 / 360 ) = 60FT /sec?

--
Bira
http://compexplicita.blogspot.com
http://sinfoniaferida.blogspot.com