On 6/27/06, Clinton N. Fell <[EMAIL PROTECTED]> wrote:
Hey, A small substation typically has 5000 KVA (effectively 5MW) which would give 1.4 FT/sec but would cause a large enough disturbance that the power company would probably cut it off in a few minutes. A large substation (typical in European urban areas) would be around 20MW and would give around 6FT/sec.
Isn't that (5000 / 360) = 14FT/sec and (20000 / 360 ) = 60FT /sec? -- Bira http://compexplicita.blogspot.com http://sinfoniaferida.blogspot.com _______________________________________________ GurpsNet-L mailing list <[email protected]> http://mail.sjgames.com/mailman/listinfo/gurpsnet-l
