Is it imperative that the tape anchors go all the way over the top to the
other side?

I'm making a 6' stretch hexayurt and have 4 anchors, 2 on each of the 8'
sides.  I'd like to add an anchor on each end where the two 4' panels join,
with the tape just extending up to the roof ridge, but not necessarily
extending the full length of the ridge.  Will that work?  Is there a better
way to add anchors to the ends?

Thanks,

Milt

-- 
You received this message because you are subscribed to the Google Groups 
"hexayurt" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/hexayurt?hl=en.

Reply via email to