Forgot to ask, for the permanent hinged sections, is this the right way to 
go about doing this? Except with beveled edges for the tops/roof attachment 
points. Or should I bevel the side joints on the walls too? And if so, how 
should I go about taping them? Sorry for the dumb questions! 
 https://www.youtube.com/watch?v=vkf5jaHxw7w 

-- 
You received this message because you are subscribed to the Google Groups 
"hexayurt" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/hexayurt.
For more options, visit https://groups.google.com/d/optout.

Reply via email to