Just so I understand
If I Attach a Task with a ECB parameter this ECB is posted by MVS when
the Subtask does a BR 14 to MVS
When this ECB is posted I do DETACH to remove the TCB
If I don't code these two parameters the when the SUBTASK does a BR R14 to
MVS everything (TCB etc) goes away automatically
Would there be any reason to code both these parameter I guess maybe if
after the task end I might want to look at the TCBTIME to see how much time
CPU time the
Task used
Am I on the right track
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html