Just so I understand 

 

    If I Attach a Task with a ECB parameter this ECB is posted by MVS when
the Subtask does a BR 14 to MVS 

 

 

When this ECB is posted I do DETACH to remove the TCB 

 

 

If I don't code these two parameters the when the SUBTASK does a BR R14 to
MVS everything (TCB etc) goes away automatically 

 

 

Would there be any reason to code both these parameter I guess maybe if
after the  task end I might want to look at the TCBTIME to see how much time
CPU time the 

Task used 

 

Am I on the right track     


----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to