On Sat, 30 Oct 2010 21:39:17 -0400 Micheal Butz <[email protected]>
wrote:

:>Just so I understand 

:>    If I Attach a Task with a ECB parameter this ECB is posted by MVS when
:>the Subtask does a BR 14 to MVS 

More precisely, when the SVC 3 pointed to by R14 is executed.

:>When this ECB is posted I do DETACH to remove the TCB 

Or not. But at this point it is safe to so do.

:>If I don't code these two parameters the when the SUBTASK does a BR R14 to
:>MVS everything (TCB etc) goes away automatically 

I presume you are also referring to ETXR. Yes, the TCB is magically cleaned
up.

:>Would there be any reason to code both these parameter I guess maybe if
:>after the  task end I might want to look at the TCBTIME to see how much time
:>CPU time the 
:>Task used 

Or any other reason. Or if you want to know when it is safe to terminate
cleanly.

--
Binyamin Dissen <[email protected]>
http://www.dissensoftware.com

Director, Dissen Software, Bar & Grill - Israel


Should you use the mailblocks package and expect a response from me,
you should preauthorize the dissensoftware.com domain.

I very rarely bother responding to challenge/response systems,
especially those from irresponsible companies.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to