In <000001cb789c$6eee3f90$4ccabe...@net>, on 10/30/2010
   at 09:39 PM, Micheal Butz <[email protected]> said:

>    If I Attach a Task with a ECB parameter this ECB is posted by MVS
>when the Subtask does a BR 14 to MVS 

Yes.

>When this ECB is posted I do DETACH to remove the TCB 

After extracting any data you need.

>If I don't code these two parameters the when the SUBTASK does a BR
>R14 to MVS everything (TCB etc) goes away automatically 

These? You never mentioned the exit (ETXR) parameter. If that the
other one that you meant? The processing is similar.

>Would there be any reason to code both these parameter

Examine storage owned by the subtask.
 
-- 
     Shmuel (Seymour J.) Metz, SysProg and JOAT
     ISO position; see <http://patriot.net/~shmuel/resume/brief.html> 
We don't care. We don't have to care, we're Congress.
(S877: The Shut up and Eat Your spam act of 2003)

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to